Matching Items (18)
Created2011 to 2016
Description

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories.

The State of the System Report is a compilation of the physical inventory and status of the Maricopa County Department of Transportation’s infrastructure. It addresses roadway congestion, traffic safety, low volume road paving, bridges, and pavement conditions. Also, included are recommendations for future improvements within each of the infrastructure categories. The SOS report has been produced annually since 1998.

41817-Thumbnail Image.png
ContributorsMokwa, Michael (Author) / McIntosh, Daniel (Author) / Eaton, John (Author) / Evans, Anthony (Author) / Hill, Kent (Author) / L. William Seidman Research Institute (Contributor)
Created2016-04-13
Description

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact. 

41818-Thumbnail Image.png
ContributorsJames, Tim (Timothy Jon) (Author) / Evans, Anthony John (Author) / Madly, Eva (Author) / L. William Seidman Research Institute (Contributor)
Created2014-04-04
Description

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both analyses. The economic impacts for each analysis are assessed in terms of gross state product (GSP) and employment.

117491-Thumbnail Image.png
Created2013-07
Description

The Arizona Department of Transportation, through its Multimodal Planning and Communications divisions, collaborated with the town of Queen Creek to conduct a transportation study of the Germann Road corridor. The study, which is funded through the Planning Assistance for Rural Areas (PARA) program, was completed in July 2013.

115396-Thumbnail Image.png
Created2014-06
Description

Planning to Programming Link development started with ADOT's multimodal visioning called "Building a Quality Arizona" (bqAZ), the 2010 Statewide Transportation Planning Framework Study created a fiscally-unconstrained vision for the state's transportation system in 2050. bqAZ led to "What Moves You Arizona?," the state's Long-Range Transportation Plan 2010-2035, which applied financial

Planning to Programming Link development started with ADOT's multimodal visioning called "Building a Quality Arizona" (bqAZ), the 2010 Statewide Transportation Planning Framework Study created a fiscally-unconstrained vision for the state's transportation system in 2050. bqAZ led to "What Moves You Arizona?," the state's Long-Range Transportation Plan 2010-2035, which applied financial constraint to the vision, identifying anticipated revenues and providing a recommended investment choice (RIC) that indicates how revenues will be allocated to four different investment types: preservation, expansion, modernization, and non-highway. The third step, and subject of this report, is "Linking the Long-Range Plan and Capital Improvement Program," or P2P Link, which focuses on how ADOT and its primary business partners, the Federal Highway Administration (FHWA), Metropolitan Planning Organizations (MPOs), and Councils of Governments (COGs), fund, build, maintain and operate the transportation system.

42238-Thumbnail Image.png
Created2011-02
Description

The Arizona Department of Transportation is the primary decision maker for federal-aid transportation plans and investments in non-metropolitan areas with populations below 50,000. However, ADOT understands the importance of consulting with local governments before, during, and after the decision making process to ensure participation results in improved transportation system planning,

The Arizona Department of Transportation is the primary decision maker for federal-aid transportation plans and investments in non-metropolitan areas with populations below 50,000. However, ADOT understands the importance of consulting with local governments before, during, and after the decision making process to ensure participation results in improved transportation system planning, performance and project development. Therefore, ADOT has developed guidelines that outline the consultation process, and defines how and when outreach will occur with officials from rural areas. It is intended that this document is subject to review and revision every 5 years. In the event that Congress enacts new transportation language, this document will be subject to immediate revision.

Created1999-05-19
Description

This plan updates, expands and continues the work of the "1994 Maricopa County Draft Bicycle Plan." Utilizing a five year time frame the Bicycle System Plan works towards implementing bicycle related recommendations from the "Comprehensive Plan" and "Transportation System Plan" as adopted by the Board of Supervisors.

Created2009 to 2017
Description

Constitutes the Department's annual report and projected plans for the coming year. The report covers a five year period, but is issued annually.