Matching Items (49)
42896-Thumbnail Image.png
Created2013-10
Description

As part of the Long Term Pavement Performance (LTPP) Program, the Arizona Department of Transportation constructed 19 Specific Pavement Studies 6 (SPS‐6) test sections on Interstate 40 near Flagstaff. The SPS‐6 project studied the effect of specific rehabilitation treatments on jointed portland cement concrete pavement (JPCP) performance. The test sections

As part of the Long Term Pavement Performance (LTPP) Program, the Arizona Department of Transportation constructed 19 Specific Pavement Studies 6 (SPS‐6) test sections on Interstate 40 near Flagstaff. The SPS‐6 project studied the effect of specific rehabilitation treatments on jointed portland cement concrete pavement (JPCP) performance. The test sections had various JPCP surface preparations, including crack and seat, minimum and maximum restoration, rubblization, asphalt concrete (AC) with fabric, and asphalt rubber with conventional AC. Opened to traffic in 1991, the project was monitored at regular intervals until 2002. Surface distress, profile, and deflection data collected throughout the life of the pavement were used to evaluate the performance of various flexible pavement design features, layer configurations, and thickness. This report documents the analyses conducted as well as practical findings and lessons learned that will be of interest to ADOT.

ContributorsJacobs Engineering Group (Author)
Created2012-06
Description

Over the past 15 years, the Phoenix-Mesa Gateway Airport has been in a continual planning and development program, responding to the dynamic air travel market in the Phoenix metropolitan area. A study was done to develop a phased, revenue generating land use and ground transportation plan for an approximate 660 acre

Over the past 15 years, the Phoenix-Mesa Gateway Airport has been in a continual planning and development program, responding to the dynamic air travel market in the Phoenix metropolitan area. A study was done to develop a phased, revenue generating land use and ground transportation plan for an approximate 660 acre parcel, with an adjoining 31 acre privately-owned parcel, both located in the Northeast Area of the Airport. This report presents the analysis, findings, and recommendations in support of those objectives.

41817-Thumbnail Image.png
ContributorsMokwa, Michael (Author) / McIntosh, Daniel (Author) / Eaton, John (Author) / Evans, Anthony (Author) / Hill, Kent (Author) / L. William Seidman Research Institute (Contributor)
Created2016-04-13
Description

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact. 

41818-Thumbnail Image.png
ContributorsJames, Tim (Timothy Jon) (Author) / Evans, Anthony John (Author) / Madly, Eva (Author) / L. William Seidman Research Institute (Contributor)
Created2014-04-04
Description

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both analyses. The economic impacts for each analysis are assessed in terms of gross state product (GSP) and employment.

117477-Thumbnail Image.png
Created2015-07
Description

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services.

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services. Today, the community area serves as a major center for housing, education, health and government operations. Also in the Burnside area, the Ganado School District recently established a new high school and sports venue to accommodate track and field, baseball, and basketball activities.

There are four main roadway corridors that intersect the study area: State Route 264, US Route 191, Navajo Route 27 and Navajo Route 15. There are also county gravel roads and private and community dirt roads that intersect SR 264, the main traffic corridor. Within these routes there is substantial multimodal activity generated from the area schools, medical facilities, transit operations, government entities, utility providers and social programs. The principal focus of this study project is to address the most critical transportation planning needs identified by the Ganado Chapter and Apache County. This will include, but is not limited to, a comprehensive needs analysis of multimodal movements and traffic circulation as well as safety issues for the project area corridors. The major product of the study will be a final report, which contains a Plan for Improvements. Taking into consideration received public input, the Plan will span over five-, 10- and 20-year periods, incorporating both roadways and the multimodal needs of the area.

The Ganado-Burnside Area Traffic Circulation Study will also be conducted according to a cooperative planning process that involves stakeholders that include public agency staff, elected tribal officials and tribal community members. Throughout the study, information will be presented to and solicited from stakeholders through individual interviews and to the general public through public meetings and other means of communication.

118019-Thumbnail Image.png
Created1990-07-11
Description

Under contract HFR-PL-1(31)264, "Concrete Pavement Design and Rehabilitation," a comprehensive data base was created which contains pavement design and construction data, climatic information, traffic data, and condition data for 48 pavement sections. The data base includes projects from jointed concrete pavements (40 sections), prestressed concrete pavements (4 sections), continuousIy reinforced

Under contract HFR-PL-1(31)264, "Concrete Pavement Design and Rehabilitation," a comprehensive data base was created which contains pavement design and construction data, climatic information, traffic data, and condition data for 48 pavement sections. The data base includes projects from jointed concrete pavements (40 sections), prestressed concrete pavements (4 sections), continuousIy reinforced concrete pavements (2 sections), and 3-layer structural rehabilitation pavements (2 sections).

118126-Thumbnail Image.png
Created2016-07
Description
The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness

The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness of removing the trees, ADOT intends to conduct statistically rigorous before-after safety effectiveness analysis to estimate state-specific crash modification factors (CMFs).
118127-Thumbnail Image.png
Created2015-05
Description
Windblown dust events occur in Arizona, and blowing dust has been considered a contributing factor to serious crashes on ... Arizona roadways.... [T]he Arizona Department of Transportation (ADOT) acquires information about predicted or in-progress dust events through National Weather Service forecasts and advisories and through field reports from motorists and

Windblown dust events occur in Arizona, and blowing dust has been considered a contributing factor to serious crashes on ... Arizona roadways.... [T]he Arizona Department of Transportation (ADOT) acquires information about predicted or in-progress dust events through National Weather Service forecasts and advisories and through field reports from motorists and ADOT personnel. ADOT then communicates this information to the public.... During this project, researchers developed a set of recommendations that ADOT can implement to identify the most effective means for acquiring data about windblown dust events, communicating ... to the public, and influencing driver behavior....--Page v.