Matching Items (51)
Filtering by

Clear all filters

118014-Thumbnail Image.png
Created2010-10
Description

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water samples were collected from two storm water detention basins and a discharge point to the Salt River. The study was conducted by manually collecting storm water samples with passive automatic samplers and analyzing them for various roadway constituents. A primary objective of this research effort was to establish baseline values of constituents in ADOT highway runoff, aiding in the evaluation of related best management practices. A total of 16 storm water samples was collected from the research area between January 2007 and December 2007.

118016-Thumbnail Image.png
Created1992-12
Description

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.

118020-Thumbnail Image.png
Created1991-07
Description

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging operation. Intersection delay studies were also done with first car versus third car actuation of leading protected left turn phases. Signal progression was studied with leading, lagging and combination of leading and lagging left turns which provided the best progression. This evaluation was accomplished with an instrumented vehicle and travel time runs throughout a grid. Accident studies were conducted in Tucson, Pima County and Scottsdale, Arizona. These studies compared accident frequency before and after the conversion from leading to lagging left turns. A public opinion survey was conducted to obtain motorists' preference of leading or lagging left turns.

114924-Thumbnail Image.png
Created2013-02
Description

The Arizona Department of Transportation’s (ADOT’s) process for working with Local Public Agencies (LPAs) in the development and delivery of their transportation projects has evolved over the years. Recent changes in Arizona’s economy have reduced the distribution of state funds for local transportation projects, which has increased the demand for

The Arizona Department of Transportation’s (ADOT’s) process for working with Local Public Agencies (LPAs) in the development and delivery of their transportation projects has evolved over the years. Recent changes in Arizona’s economy have reduced the distribution of state funds for local transportation projects, which has increased the demand for federal funding sources. In response to the anticipated increase in LPA projects desiring the use of federal funds and the continuing need to meet state and local transportation requirements, this updated manual highlights the steps necessary to capably deliver LPA projects in compliance with federal, state, and local requirements.

The ADOT Local Public Agency Projects Manual has been a collaborative effort among the various Divisions, Groups, and Sections within ADOT, as well as the Federal Highway Administration (FHWA) Arizona Division, with input from LPAs. ADOT would like to express sincere gratitude to Logan Simpson Design Inc. for successfully facilitating that effort and for their contribution to the production of this manual. Their hard work and in-depth coordination with ADOT and FHWA staff has been invaluable to the preparation of this manual.

110269-Thumbnail Image.png
Created2005-03-04
Description

This "document was prepared in 2008-2009. In addition to field reviews and available research, significant information was obtained from public opinion and concerns voiced during the public and Citizen Advisory Committee meetings held along the route. The primary objective of this report is to document desired efforts along the Fredonia-Vermilion

This "document was prepared in 2008-2009. In addition to field reviews and available research, significant information was obtained from public opinion and concerns voiced during the public and Citizen Advisory Committee meetings held along the route. The primary objective of this report is to document desired efforts along the Fredonia-Vermilion Cliffs Scenic Road that will sustain its resources for future generations. Additionally, this document fosters the necessary relationships required to promote and protect the intrinsic qualities that define this scenic road experience."--Foreword