Description
This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.
Details
Title
- SPS-5 and SPS-6 SHRP Data Collection: Final Report
Contributors
- Arizona. Department of Transportation (Issuing body)
- ARE Inc. (Publisher)
- United States. Department of Transportation (Contributor)
- United States. Federal Highway Administration (Contributor)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
1992-12
Subjects
Resource Type
Collections this item is in
Note
- Report number: FHWA-AZ92-379-INote typenumbering
- December 1992Note typedate
Citation and reuse
Statement of Responsibility
Prepared by:
Austin Research Engineers, Inc.
Prepared for:
Arizona Department of Transportation
in cooperation with
U.S. Department of Transportation
Federal Highway Administration
Austin Research Engineers, Inc.
Prepared for:
Arizona Department of Transportation
in cooperation with
U.S. Department of Transportation
Federal Highway Administration