Matching Items (36)
ContributorsJacobs Engineering Group (Author)
Created2012-06
Description

Over the past 15 years, the Phoenix-Mesa Gateway Airport has been in a continual planning and development program, responding to the dynamic air travel market in the Phoenix metropolitan area. A study was done to develop a phased, revenue generating land use and ground transportation plan for an approximate 660 acre

Over the past 15 years, the Phoenix-Mesa Gateway Airport has been in a continual planning and development program, responding to the dynamic air travel market in the Phoenix metropolitan area. A study was done to develop a phased, revenue generating land use and ground transportation plan for an approximate 660 acre parcel, with an adjoining 31 acre privately-owned parcel, both located in the Northeast Area of the Airport. This report presents the analysis, findings, and recommendations in support of those objectives.

41740-Thumbnail Image.png
Created2017-01
Description

An assessment for fiscal year (FY) 2016 of the contribution of Arizona State University (ASU) to the Arizona economy, based on the economic impact of its employment and spending, its benefits as a provider of higher education, and its research.

41817-Thumbnail Image.png
ContributorsMokwa, Michael (Author) / McIntosh, Daniel (Author) / Eaton, John (Author) / Evans, Anthony (Author) / Hill, Kent (Author) / L. William Seidman Research Institute (Contributor)
Created2016-04-13
Description

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact. 

41818-Thumbnail Image.png
ContributorsJames, Tim (Timothy Jon) (Author) / Evans, Anthony John (Author) / Madly, Eva (Author) / L. William Seidman Research Institute (Contributor)
Created2014-04-04
Description

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both analyses. The economic impacts for each analysis are assessed in terms of gross state product (GSP) and employment.

41821-Thumbnail Image.png
Created2009-11
Description

An assessment of the contribution of Arizona State University to the Arizona economy, based on the economic impact of its employment and spending, on its benefits as a provider of higher education, and on its research.

117477-Thumbnail Image.png
Created2015-07
Description

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services.

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services. Today, the community area serves as a major center for housing, education, health and government operations. Also in the Burnside area, the Ganado School District recently established a new high school and sports venue to accommodate track and field, baseball, and basketball activities.

There are four main roadway corridors that intersect the study area: State Route 264, US Route 191, Navajo Route 27 and Navajo Route 15. There are also county gravel roads and private and community dirt roads that intersect SR 264, the main traffic corridor. Within these routes there is substantial multimodal activity generated from the area schools, medical facilities, transit operations, government entities, utility providers and social programs. The principal focus of this study project is to address the most critical transportation planning needs identified by the Ganado Chapter and Apache County. This will include, but is not limited to, a comprehensive needs analysis of multimodal movements and traffic circulation as well as safety issues for the project area corridors. The major product of the study will be a final report, which contains a Plan for Improvements. Taking into consideration received public input, the Plan will span over five-, 10- and 20-year periods, incorporating both roadways and the multimodal needs of the area.

The Ganado-Burnside Area Traffic Circulation Study will also be conducted according to a cooperative planning process that involves stakeholders that include public agency staff, elected tribal officials and tribal community members. Throughout the study, information will be presented to and solicited from stakeholders through individual interviews and to the general public through public meetings and other means of communication.

42259-Thumbnail Image.png
Created2013-11-25
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at a Concentration Point for the Unnamed 02 and 03 Washes, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data. This is a local study and has not been submitted to FEMA.

42282-Thumbnail Image.png
Created2012-11-29
Description

The objective of this Technical Data Notebook is to provide 100-yr peak discharges at Concentration Points for the Unnamed Wash 12, 100-yr floodplain boundary and erosion hazard information, using the most up-to-date topographic, hydrologic, and hydraulic data.

42283-Thumbnail Image.png
Created2012-11-29
Description

This Technical Data notebook has been prepared to study a portion of the Pegler Wash located in Pima County, Arizona. The objective of the TDN is provide regulatory discharge rates and floodplain limits along the Pegler Wash using better topographic, hydrologic, and hydraulic data.