Filtering by
- Creators: Broadway Music Corp.
Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change as the regional transit network develops over the life of the 20 year transit program.
The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact.
This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both analyses. The economic impacts for each analysis are assessed in terms of gross state product (GSP) and employment.