Matching Items (470)
Filtering by

Clear all filters

41827-Thumbnail Image.png
ContributorsHill, John K. (Author) / Hoffman, Dennis L. (Author) / Rex, Tom R. (Author)
Created2008
Description

The state government general fund shortfall in the current fiscal year is projected to be between about $550 million and $1 billion. This shortfall will need to be eliminated through spending cuts and/or revenue enhancements. The Legislature has demonstrated a preference for spending cuts. However demand does not decline during

The state government general fund shortfall in the current fiscal year is projected to be between about $550 million and $1 billion. This shortfall will need to be eliminated through spending cuts and/or revenue enhancements. The Legislature has demonstrated a preference for spending cuts. However demand does not decline during a recession for most public-sector services, including university services. Any reduction in funding for universities will have a negative and direct effect. A reduction in state government spending for universities of around $200 million would cause direct and indirect job losses of approximately 4,000. A substantial decrease in state government funding for universities will have negative consequences beyond these short-term effects.

118014-Thumbnail Image.png
Created2010-10
Description

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water samples were collected from two storm water detention basins and a discharge point to the Salt River. The study was conducted by manually collecting storm water samples with passive automatic samplers and analyzing them for various roadway constituents. A primary objective of this research effort was to establish baseline values of constituents in ADOT highway runoff, aiding in the evaluation of related best management practices. A total of 16 storm water samples was collected from the research area between January 2007 and December 2007.

118016-Thumbnail Image.png
Created1992-12
Description

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.

118020-Thumbnail Image.png
Created1991-07
Description

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging operation. Intersection delay studies were also done with first car versus third car actuation of leading protected left turn phases. Signal progression was studied with leading, lagging and combination of leading and lagging left turns which provided the best progression. This evaluation was accomplished with an instrumented vehicle and travel time runs throughout a grid. Accident studies were conducted in Tucson, Pima County and Scottsdale, Arizona. These studies compared accident frequency before and after the conversion from leading to lagging left turns. A public opinion survey was conducted to obtain motorists' preference of leading or lagging left turns.

118126-Thumbnail Image.png
Created2016-07
Description
The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness

The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness of removing the trees, ADOT intends to conduct statistically rigorous before-after safety effectiveness analysis to estimate state-specific crash modification factors (CMFs).