Filtering by
This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”
The Short Range Transit Program identifies those regional transit service and capital improvements programmed in the Transit Life Cycle Program during the next five years and provides support for regional transit projects contained in the Maricopa Association of Governments Regional Transportation Plan.
Valley Metro's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.
The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.
The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact.
This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both analyses. The economic impacts for each analysis are assessed in terms of gross state product (GSP) and employment.
Pima County is now finalizing the long-awaited Multi-species Conservation Plan, which, if approved by the U.S. Fish and Wildlife Service, will streamline public-sector and private-sector development compliance with the Endangered Species Act while protecting endangered species and their habitats. In the coming months, the public will have a chance to comment on the MSCP through the U.S. Fish and Wildlife Service’s formal public comment process before it goes to the County Board of Supervisors for final adoption.This report reviews the history of the MSCP, its relationship with the award-winning Sonoran Desert Conservation Plan, what benefits the MSCP will bring to the community, and what obligations the County, developers, and the taxpayers will have over time. The report also highlights other benefits of conservation actions undertaken by Pima County, including economic, recreation, and health benefits.
The purpose of this report is to highlight lands acquired with 1997 and 2004 voter-approved bond funds, provide a historical record of Pima County’s land conservation efforts and consider how these properties contribute to Pima County’s long-term vision – the Sonoran Desert Conservation Plan. The report also provides a special feature on the evolution of conservation and land use planning in Pima County.