Filtering by
- Creators: Lewis, Sam M., 1885-1959
This study is intended to assess flood risk, and identify flood hazards based on those risks, for the Beaver Dam area from the Beaver Dam Wash. The hydrologic and hydraulic results are intended for risk assessment and emergency management purposes only. The results of this study should not be considered as “best available technical information” for floodplain management purposes.”
The Short Range Transit Program identifies those regional transit service and capital improvements programmed in the Transit Life Cycle Program during the next five years and provides support for regional transit projects contained in the Maricopa Association of Governments Regional Transportation Plan.
Valley Metro's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.
The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.
The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact.