Matching Items (51)
42896-Thumbnail Image.png
Created2013-10
Description

As part of the Long Term Pavement Performance (LTPP) Program, the Arizona Department of Transportation constructed 19 Specific Pavement Studies 6 (SPS‐6) test sections on Interstate 40 near Flagstaff. The SPS‐6 project studied the effect of specific rehabilitation treatments on jointed portland cement concrete pavement (JPCP) performance. The test sections

As part of the Long Term Pavement Performance (LTPP) Program, the Arizona Department of Transportation constructed 19 Specific Pavement Studies 6 (SPS‐6) test sections on Interstate 40 near Flagstaff. The SPS‐6 project studied the effect of specific rehabilitation treatments on jointed portland cement concrete pavement (JPCP) performance. The test sections had various JPCP surface preparations, including crack and seat, minimum and maximum restoration, rubblization, asphalt concrete (AC) with fabric, and asphalt rubber with conventional AC. Opened to traffic in 1991, the project was monitored at regular intervals until 2002. Surface distress, profile, and deflection data collected throughout the life of the pavement were used to evaluate the performance of various flexible pavement design features, layer configurations, and thickness. This report documents the analyses conducted as well as practical findings and lessons learned that will be of interest to ADOT.

ContributorsChandler (Ariz.) (Publisher)
Created1999-09-16
Description

The Southeast Chandler Area Plan seeks to pay respect to the sense of place and history embedded in Southeast Chandler while simultaneously; a) supporting the diversity of lifestyles and development preferences of existing and future residents; b) nurturing true community building and stewardship over the unique attributes of the area;

The Southeast Chandler Area Plan seeks to pay respect to the sense of place and history embedded in Southeast Chandler while simultaneously; a) supporting the diversity of lifestyles and development preferences of existing and future residents; b) nurturing true community building and stewardship over the unique attributes of the area; and, c) fostering quality development based on sound planning principles and meaningful public involvement.

42913-Thumbnail Image.png
ContributorsChandler (Ariz.) (Publisher)
Created2008-06
Description

The updated Chandler General Plan presents instructional guidance for coping with the consequences of approaching build-out. This document is not meant to be read from cover-to-cover in a single sitting. However, a user, whether a citizen appearing at a public hearing for the first time or a long-term City official,

The updated Chandler General Plan presents instructional guidance for coping with the consequences of approaching build-out. This document is not meant to be read from cover-to-cover in a single sitting. However, a user, whether a citizen appearing at a public hearing for the first time or a long-term City official, should become familiar with the Plan's content. A comprehensive planning view encourages the General Plan user to evaluate change on a Citywide basis, directing progress for the good of the community rather than special interests.

41740-Thumbnail Image.png
Created2017-01
Description

An assessment for fiscal year (FY) 2016 of the contribution of Arizona State University (ASU) to the Arizona economy, based on the economic impact of its employment and spending, its benefits as a provider of higher education, and its research.

41817-Thumbnail Image.png
ContributorsMokwa, Michael (Author) / McIntosh, Daniel (Author) / Eaton, John (Author) / Evans, Anthony (Author) / Hill, Kent (Author) / L. William Seidman Research Institute (Contributor)
Created2016-04-13
Description

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect

The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact. 

41818-Thumbnail Image.png
ContributorsJames, Tim (Timothy Jon) (Author) / Evans, Anthony John (Author) / Madly, Eva (Author) / L. William Seidman Research Institute (Contributor)
Created2014-04-04
Description

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both

This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both analyses. The economic impacts for each analysis are assessed in terms of gross state product (GSP) and employment.

41821-Thumbnail Image.png
Created2009-11
Description

An assessment of the contribution of Arizona State University to the Arizona economy, based on the economic impact of its employment and spending, on its benefits as a provider of higher education, and on its research.

118019-Thumbnail Image.png
Created1990-07-11
Description

Under contract HFR-PL-1(31)264, "Concrete Pavement Design and Rehabilitation," a comprehensive data base was created which contains pavement design and construction data, climatic information, traffic data, and condition data for 48 pavement sections. The data base includes projects from jointed concrete pavements (40 sections), prestressed concrete pavements (4 sections), continuousIy reinforced

Under contract HFR-PL-1(31)264, "Concrete Pavement Design and Rehabilitation," a comprehensive data base was created which contains pavement design and construction data, climatic information, traffic data, and condition data for 48 pavement sections. The data base includes projects from jointed concrete pavements (40 sections), prestressed concrete pavements (4 sections), continuousIy reinforced concrete pavements (2 sections), and 3-layer structural rehabilitation pavements (2 sections).