Matching Items (104)
Filtering by

Clear all filters

41883-Thumbnail Image.png
ContributorsYuma (Ariz.) (Contributor)
Created2012
Description

A plan to redevelop the 4th Avenue and 16th Street corridors as defined in the City of Yuma's 2012 general plan.

41884-Thumbnail Image.png
ContributorsYuma (Ariz.) (Author)
Created2009
Description

A plan to revitalize the 215 acre Yuma High Neighborhood, to improve substandard housing conditions, encourage small business development and job creation, and improve community facilities.

41885-Thumbnail Image.png
ContributorsYuma (Ariz.) (Author)
Created2007
Description

A plan for the development and maintenance of the city of Yuma's roadway system, consistent with the city's 2002 general plan, and coordinated with the city's bicycle plan and the Yuma Metropolitan Planning Organization's regional transportation plan.

41887-Thumbnail Image.png
ContributorsYuma (Ariz.) (Author)
Created2006
Description

Provides a plan for the development of park and recreation facilities in Yuma, Arizona to serve its residents and others in the surrounding area.

ContributorsYuma (Ariz.) (Author)
Created2012-06-06
Description

A policy document and guide for the growth and development of the city of Yuma in the next 10-20 years.

41891-Thumbnail Image.png
ContributorsYuma (Ariz.) (Author)
Created2002
Description

A policy document and guide for the growth and development of the city of Yuma in the next 10-20 years.

118014-Thumbnail Image.png
Created2010-10
Description

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water samples were collected from two storm water detention basins and a discharge point to the Salt River. The study was conducted by manually collecting storm water samples with passive automatic samplers and analyzing them for various roadway constituents. A primary objective of this research effort was to establish baseline values of constituents in ADOT highway runoff, aiding in the evaluation of related best management practices. A total of 16 storm water samples was collected from the research area between January 2007 and December 2007.

118016-Thumbnail Image.png
Created1992-12
Description

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.