Matching Items (94)
Filtering by

Clear all filters

ContributorsJacobs Engineering Group (Author)
Created2012-06
Description

Over the past 15 years, the Phoenix-Mesa Gateway Airport has been in a continual planning and development program, responding to the dynamic air travel market in the Phoenix metropolitan area. A study was done to develop a phased, revenue generating land use and ground transportation plan for an approximate 660 acre

Over the past 15 years, the Phoenix-Mesa Gateway Airport has been in a continual planning and development program, responding to the dynamic air travel market in the Phoenix metropolitan area. A study was done to develop a phased, revenue generating land use and ground transportation plan for an approximate 660 acre parcel, with an adjoining 31 acre privately-owned parcel, both located in the Northeast Area of the Airport. This report presents the analysis, findings, and recommendations in support of those objectives.

117477-Thumbnail Image.png
Created2015-07
Description

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services.

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services. Today, the community area serves as a major center for housing, education, health and government operations. Also in the Burnside area, the Ganado School District recently established a new high school and sports venue to accommodate track and field, baseball, and basketball activities.

There are four main roadway corridors that intersect the study area: State Route 264, US Route 191, Navajo Route 27 and Navajo Route 15. There are also county gravel roads and private and community dirt roads that intersect SR 264, the main traffic corridor. Within these routes there is substantial multimodal activity generated from the area schools, medical facilities, transit operations, government entities, utility providers and social programs. The principal focus of this study project is to address the most critical transportation planning needs identified by the Ganado Chapter and Apache County. This will include, but is not limited to, a comprehensive needs analysis of multimodal movements and traffic circulation as well as safety issues for the project area corridors. The major product of the study will be a final report, which contains a Plan for Improvements. Taking into consideration received public input, the Plan will span over five-, 10- and 20-year periods, incorporating both roadways and the multimodal needs of the area.

The Ganado-Burnside Area Traffic Circulation Study will also be conducted according to a cooperative planning process that involves stakeholders that include public agency staff, elected tribal officials and tribal community members. Throughout the study, information will be presented to and solicited from stakeholders through individual interviews and to the general public through public meetings and other means of communication.

118014-Thumbnail Image.png
Created2010-10
Description

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water samples were collected from two storm water detention basins and a discharge point to the Salt River. The study was conducted by manually collecting storm water samples with passive automatic samplers and analyzing them for various roadway constituents. A primary objective of this research effort was to establish baseline values of constituents in ADOT highway runoff, aiding in the evaluation of related best management practices. A total of 16 storm water samples was collected from the research area between January 2007 and December 2007.

118016-Thumbnail Image.png
Created1992-12
Description

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.

118020-Thumbnail Image.png
Created1991-07
Description

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging

This project was undertaken to compare operational and safety characteristics of leading versus lagging protected left turn operation. The measures of effectiveness included field measured intersection delay with leading and with lagging left turns. Intersections in Pima County, Glendale, Tempe and Mesa, Arizona were studied with both leading and lagging operation. Intersection delay studies were also done with first car versus third car actuation of leading protected left turn phases. Signal progression was studied with leading, lagging and combination of leading and lagging left turns which provided the best progression. This evaluation was accomplished with an instrumented vehicle and travel time runs throughout a grid. Accident studies were conducted in Tucson, Pima County and Scottsdale, Arizona. These studies compared accident frequency before and after the conversion from leading to lagging left turns. A public opinion survey was conducted to obtain motorists' preference of leading or lagging left turns.

118126-Thumbnail Image.png
Created2016-07
Description
The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness

The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. Previous ADOT work has identified locations for tree removal, and activities to conduct this work are underway. To test the safety effectiveness of removing the trees, ADOT intends to conduct statistically rigorous before-after safety effectiveness analysis to estimate state-specific crash modification factors (CMFs).