Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

43031-Thumbnail Image.png
Created2011-09-19
Description

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that

This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that includes members from the Town of Colorado City; adjacent Hildale City, Utah; Mohave County; the Arizona Department of Transportation Multimodal Planning Division; the ADOT Flagstaff District Engineer’s office; and other interested parties.

43267-Thumbnail Image.png
Created2005-09-07
Description

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted water supplies in Arizona. The ADEQ investigated the total chromium and hexavalent chromium (chromium VI) concentrations in (1) public water supply wells, (2) combined industrial and domestic water supply wells, and (3) private domestic water supply wells at Topock and Golden Shores, Arizona. The communities of Topock and Golden Shores have expressed their concerns regarding the findings. Thus, the ADEQ requested the Arizona Department of Health Services to evaluate the potential health effects of exposure to well water contaminated with chromium.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.