Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

Downloads
pdf (7.6 MB)

Details

Title
  • Houghton Area Master Plan (HAMP): Potable and Reclaimed Water Conceptual Plan
Date Created
2008-03
Resource Type
  • Text
  • Identifier
    • Identifier Value
      XUTU 6.2:H 58

    Machine-readable links