Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42322-Thumbnail Image.png
Created1999-11-30
Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

42319-Thumbnail Image.png
Created1999-06
Description

This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.