Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.