A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

42363-Thumbnail Image.png
Created2009-01-21
Description

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management

Covers an area in southeastern Pima County that drains the Arivaca Creek watershed. The purpose of the report is to estimate peak discharge for the 50 year storm frequency event, utilizing the rational method (Q=CiA). This method pre-dates that outlined in the Hydrology Manual for Engineering Design and Floodplain Management within Pima County, Sept. 1979, and is considered less accurate. It is recommended that this report be archived and discontinued for use for regulatory purposes.

42360-Thumbnail Image.png
Created1986-03-15
Description

This report is the first phase of a study to provide a basin management plan for the Tucson Mountain Drainage Basin. Phase II will identify and evaluate alternative specific solutions to flood plain management measures with Phase III accomplishing conceptual designs for the selected alternatives.

42357-Thumbnail Image.png
Created1988-02-04
Description

This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42349-Thumbnail Image.png
Created1989 to 1991
Description

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at

The purpose of the study is to identify existing flooding problems for fifteen homes adjacent and west of Holladay Street which have experienced flooding in the past three years. A 1991 follow-up report is included that corrects an error in the earlier report's estimation of the split flow quantities at the intersection.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42336-Thumbnail Image.png
Created1986 to 1995
Description

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries for the associated channels.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.