Description

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries for the associated channels.

Downloads
pdf (18.6 MB)

Details

Title
  • Hydrologic and Hydraulic Report for Unit 21 at New Tucson
Date Created
1986 to 1995
Resource Type
  • Text
  • Identifier
    • Identifier Value
      XCPM 17.3:S 63/27
    Note
    • Special study (Pima County Regional Flood Control District (Ariz.)), opens in a new window ; 27
    • With: Erosion-hazard setback analysis for Unit 23, New Tucson (p. 64-121 : January 1995).

    Machine-readable links