Filtering by
- All Subjects: Hydrology
- All Subjects: United States--Commerce--Mexico
- Creators: Battelle Memorial Institute. Technology Partnership Practice
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
This pamphlet describes CyberPort as multinational in its approach, considering the impacts of cross-border traffic at the local, state, and regional levels. The goal of CyberPort in Arizona is to increase the capacity of Nogales, San Luis and Douglas to serve as safe, secure and efficient gateways between the United States and Mexico. Nogales, as Arizona’s primary commercial port-of-entry, is naturally positioned to serve as the port of choice for western U.S.-Mexico trade.
The Arizona Department of Transportation, the Arizona Game & Fish Department and the Arizona State Parks Board are required to conduct a study every three years on watercraft fuel consumption and recreational watercraft usage. The fuel consumption data is collected to determine the allocation of motor vehicle fuel tax to the State Lake Improvement Fund. The information on recreational watercraft usage patterns on Arizona’s lakes and rivers is necessary, in part, to determine the distribution of SLIF funds to applicants.
The Nogales CyberPort Project began in the Spring of 2002 amid dramatic changes to the safety and security of U.S. borders. Throughout the following year, extraordinary change was experienced in policy and practice regarding the treatment of the border at the local, state and federal levels. While the movement toward a more efficient and effective border crossing environment has been underway in Arizona and the U.S. for a number of years, there is perhaps a no more appropriate time to undertake the effort to define and implement a CyberPort than right now.
The Nogales CyberPort Project began in the Spring of 2002 amid dramatic changes to the safety and security of U.S. borders. Throughout the following year, extraordinary change was experienced in policy and practice regarding the treatment of the border at the local, state and federal levels. While the movement toward a more efficient and effective border crossing environment has been underway in Arizona and the U.S. for a number of years, there is perhaps a no more appropriate time to undertake the effort to define and implement a CyberPort than right now.
This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.
Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.
This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.
This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries for the associated channels.