Matching Items (19)
Filtering by

Clear all filters

Created1994-04-29
Description

Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

Created1990-07
Description

The purpose of this study, which represents Phase I, is to determine long range planning and land use policies for flood control and floodplain management in the southwest area.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.

42346-Thumbnail Image.png
Created1994-10
Description

The purpose of this study is to revise the existing Flood Insurance Study and Flood Insurance Rate Maps for a portion of the Canada del Oro Wash. This information will be used by Pima County to update existing flood plain information.

42343-Thumbnail Image.png
Created1992-09
Description

The study developed the 100-year floodplain limits within the watershed and identified the area between Westover Avenue and Valencia Road as a major flood hazard area affecting most of the properties along the channel.

42339-Thumbnail Image.png
Created1993-08-03
Description

This plan has focused on two program areas: 1) floodplain management through revised floodplain delineations and assessment of subsequent FEMA mapping revisions; and 2) basin-wide planning issues involving both short- and long-term drainage infrastructure and regulatory needs.