Matching Items (9)
Filtering by

Clear all filters

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created2014-03-14
Description

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on the Navajo Nation. The study was funded by the Federal Highway Administration’s State Planning and Research Program and administered through ADOT’s Multimodal Planning Division's Planning Assistance for Rural Areas (PARA) program. The study was initiated to develop a planning strategy to improve the mobility and safety within the Fort Defiance Industrial Area.

43034-Thumbnail Image.png
Created2010-12
Description

This study focuses in the area surrounding the municipalities of: Town of Pima, City of Thatcher and City of Safford. The junction of the two major state routes, US 191 and US 70 is located in the heart of these communities and serves as major arterials for local travelers. Parsons

This study focuses in the area surrounding the municipalities of: Town of Pima, City of Thatcher and City of Safford. The junction of the two major state routes, US 191 and US 70 is located in the heart of these communities and serves as major arterials for local travelers. Parsons Brinckerhoff has been commissioned by ADOT to perform this preliminary assessment for the development of an alternate route through the Thatcher/Safford/Pima area.

42935-Thumbnail Image.png
Created2009-12-31
Description

The San Xavier District of the Tohono O’odham Nation is home to approximately 2,000 people. Numerous others come to the District to visit the San Xavier del Bac Mission Church. The San Xavier District Pedestrian Access and Safety Study is being prepared to improve the walking and bicycling environment on

The San Xavier District of the Tohono O’odham Nation is home to approximately 2,000 people. Numerous others come to the District to visit the San Xavier del Bac Mission Church. The San Xavier District Pedestrian Access and Safety Study is being prepared to improve the walking and bicycling environment on the San Xavier District for Community members and visitors alike. The study is being funded by the Arizona Department of Transportation Multimodal Planning Division’s Planning Assistance for Rural Areas program.

43194-Thumbnail Image.png
Created1999-09
Description

The historical advantages of Grand Avenue and the railroad that led to the development of the West Valley cities have become a detriment to the further development or redevelopment in the past few decades. There is general agreement that significant improvements are needed for the Grand Avenue Corridor. Identified transportation

The historical advantages of Grand Avenue and the railroad that led to the development of the West Valley cities have become a detriment to the further development or redevelopment in the past few decades. There is general agreement that significant improvements are needed for the Grand Avenue Corridor. Identified transportation funds provide an opportunity to develop a more modern transportation corridor along Grand Avenue. This study addresses these concerns by developing, evaluating, and recommending transportation investment options.

42189-Thumbnail Image.png
Created2007-08
Description

Following the completion of the 2005 report, an Act was passed that contained a number of important new and continued funding sources for safety related projects, programs, and initiatives. This required every state to develop a Strategic Highway Safety Plan. This 2007 report represents Phase 1, Development Plan and is

Following the completion of the 2005 report, an Act was passed that contained a number of important new and continued funding sources for safety related projects, programs, and initiatives. This required every state to develop a Strategic Highway Safety Plan. This 2007 report represents Phase 1, Development Plan and is a comprehensive, collaborative, high level, statewide safety strategy that will guide Arizona's safety change initiative. The Arizona Department of Transportation was assigned the role of project manager for this SHSP phase by the Governor's Traffic Safety Advisory Council.

42357-Thumbnail Image.png
Created1988-02-04
Description

This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.

42350-Thumbnail Image.png
Created1989-02-15
Description

Tucson Water's Valley View Reservoir site and Flecha Caida Ranch Estates #9 has experienced numerous drainage-related problems,including inundation, erosion, and limited access during the rainy season. A portion of the reservoir site and approximately one-half of the subdivision are both located in the 100-year flood plain.

42336-Thumbnail Image.png
Created1986 to 1995
Description

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries for the associated channels.