Matching Items (10)
Filtering by

Clear all filters

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

Created2007 to 2009
Description

The Federal Transit Administration Section 5311 Rural Public Transportation Program provides program funds for capital, operating, and administrative assistance to local public bodies, nonprofit organizations, and operators of public transportation services in non-urbanized areas. The Public Transportation Division of the Arizona Department of Transportation provides financial and technical assistance to

The Federal Transit Administration Section 5311 Rural Public Transportation Program provides program funds for capital, operating, and administrative assistance to local public bodies, nonprofit organizations, and operators of public transportation services in non-urbanized areas. The Public Transportation Division of the Arizona Department of Transportation provides financial and technical assistance to transit agencies throughout the state to enhance the access of people in non-urbanized areas to health care, shopping, education, employment, public services and recreation.

Created2012-04-30
Description

The City of Winslow North–South Transportation Plan is a multimodal plan, addressing improvements to the vehicular road network within and around the City of Winslow in addition to transit, bicycling, and pedestrian facilities. This study is being funded by the Arizona Department of Transportation Multimodal Planning Division’s Planning Assistance for

The City of Winslow North–South Transportation Plan is a multimodal plan, addressing improvements to the vehicular road network within and around the City of Winslow in addition to transit, bicycling, and pedestrian facilities. This study is being funded by the Arizona Department of Transportation Multimodal Planning Division’s Planning Assistance for Rural Areas (PARA) program. The PARA program is funded through the Federal Highway Administration’s State Planning and Research program to non-metropolitan communities for the purpose of conducting transportation planning studies. PARA funds may be applied to address a broad range of planning issues related to road and non-motorized transportation modes.

43190-Thumbnail Image.png
Created2003
Description

This pamphlet describes CyberPort as multinational in its approach, considering the impacts of cross-border traffic at the local, state, and regional levels. The goal of CyberPort in Arizona is to increase the capacity of Nogales, San Luis and Douglas to serve as safe, secure and efficient gateways between the United

This pamphlet describes CyberPort as multinational in its approach, considering the impacts of cross-border traffic at the local, state, and regional levels. The goal of CyberPort in Arizona is to increase the capacity of Nogales, San Luis and Douglas to serve as safe, secure and efficient gateways between the United States and Mexico. Nogales, as Arizona’s primary commercial port-of-entry, is naturally positioned to serve as the port of choice for western U.S.-Mexico trade.

42926-Thumbnail Image.png
Created2012-04
Description

The Transportation Needs Study is a planning effort undertaken cooperatively by Yuma County and the Multimodal Planning Division of the Arizona Department of Transportation. It has been funded and supported through the Planning Assistance for Rural Areas program of ADOT. The Study addresses the needs of multiple jurisdictions, as well

The Transportation Needs Study is a planning effort undertaken cooperatively by Yuma County and the Multimodal Planning Division of the Arizona Department of Transportation. It has been funded and supported through the Planning Assistance for Rural Areas program of ADOT. The Study addresses the needs of multiple jurisdictions, as well as the needs of neighborhoods within these jurisdictions. It encompasses a mix of uses within developed and undeveloped zoning areas of the Mesa Del Sol and Foothills areas.

43192-Thumbnail Image.png
Created2003
Description

The Nogales CyberPort Project began in the Spring of 2002 amid dramatic changes to the safety and security of U.S. borders. Throughout the following year, extraordinary change was experienced in policy and practice regarding the treatment of the border at the local, state and federal levels. While the movement toward

The Nogales CyberPort Project began in the Spring of 2002 amid dramatic changes to the safety and security of U.S. borders. Throughout the following year, extraordinary change was experienced in policy and practice regarding the treatment of the border at the local, state and federal levels. While the movement toward a more efficient and effective border crossing environment has been underway in Arizona and the U.S. for a number of years, there is perhaps a no more appropriate time to undertake the effort to define and implement a CyberPort than right now.

43191-Thumbnail Image.png
Created2003-06
Description

The Nogales CyberPort Project began in the Spring of 2002 amid dramatic changes to the safety and security of U.S. borders. Throughout the following year, extraordinary change was experienced in policy and practice regarding the treatment of the border at the local, state and federal levels. While the movement toward

The Nogales CyberPort Project began in the Spring of 2002 amid dramatic changes to the safety and security of U.S. borders. Throughout the following year, extraordinary change was experienced in policy and practice regarding the treatment of the border at the local, state and federal levels. While the movement toward a more efficient and effective border crossing environment has been underway in Arizona and the U.S. for a number of years, there is perhaps a no more appropriate time to undertake the effort to define and implement a CyberPort than right now.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.