Filtering by
- All Subjects: Tucson (Ariz.)
- All Subjects: Santa Cruz County (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.
Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.
This study is to update the current plan entitled "Unified Nogales/Santa Cruz County Transportation 2000 Plan." The local governments need a fresh look and new approach to developing their transportation plan. Purpose: The purpose of this study is to create a useful, workable transportation system planning document that contains a realistic and achievable program for implementing transportation system improvements throughout the city and the county.
Landscaping planted after January 1, 1987 within publicly owned rights-of-way and irrigated with groundwater may be planted only with plants listed on the ADWR Low Water Use/ Drought Tolerant Plant List for the Tucson AMA. The director may waive this requirement under special circumstances. This list can also be used as a resource for residents and businesses that are interested in conserving water. The list provides a wide array of plants to accomplish a variety of low wateruse landscape designs.
This report summarizes the results of an economic impact analysis of the Rosemont Copper Project, an open-pit mining operation to be developed on a 15,000 acre site in Pima County about 30 miles southeast of Tucson. The analysis employed the REMI PI+ regional economic forecasting model to estimate the economic impacts of the Project for the Cochise/Pima County/Santa Cruz Counties study area, for the State of Arizona, and for the United States.
The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.
The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.