Matching Items (16)
Filtering by

Clear all filters

Created1995-03-24
Description

A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created2000 to 2016
Description

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.

Created1998 to 2017
Description

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for new loans. Though $140 million of BFOs are authorized by statute to capitalize the HELP, the State Treasurer was required to call all outstanding BFOs in April 2009. Consequently, the State Transportation Board and the Department have suspended the HELP program given the uncertainty of a long term funding source.

42003-Thumbnail Image.png
Created2015-09
Description

Projected transportation revenues fall short of estimated needs and the Arizona Legislature should consider a task force to study options for addressing transportation revenue needs.

42357-Thumbnail Image.png
Created1988-02-04
Description

This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.

42356-Thumbnail Image.png
Created1988-06-17
Description

Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.

42341-Thumbnail Image.png
Created1992-08
Description

This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.

42336-Thumbnail Image.png
Created1986 to 1995
Description

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries for the associated channels.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.