Matching Items (7)
Filtering by

Clear all filters

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

Created2000 to 2016
Description

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present

The Arizona Department of Transportation was authorized in 1996 to administer a State Infrastructure Bank under a cooperative agreement with the Federal Highway Administration. The Highway Expansion and Extension Loan Program (HELP) was established. The financial statements present only the funds comprising the Fund and are not intended to present fairly the financial position or results of operations of the Department.

Created1998 to 2017
Description

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for

The HELP program is meant to be a funding tool to accelerate needed highway projects throughout the state. Board Funding Obligations are an important part of the HELP capitalization and the current stress on the State's General Fund has impacted our ability to use BFOs as a funding source for new loans. Though $140 million of BFOs are authorized by statute to capitalize the HELP, the State Treasurer was required to call all outstanding BFOs in April 2009. Consequently, the State Transportation Board and the Department have suspended the HELP program given the uncertainty of a long term funding source.

42003-Thumbnail Image.png
Created2015-09
Description

Projected transportation revenues fall short of estimated needs and the Arizona Legislature should consider a task force to study options for addressing transportation revenue needs.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.