Matching Items (18)
Filtering by

Clear all filters

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

42325-Thumbnail Image.png
Created1999-03-04
Description

Historically, Pima County has recorded several residential concerns, detailing this area as a reach of wash with severe flooding problems. The purpose of this report is to present the engineering analyses of four alternative remedial flood-control measures.

42326-Thumbnail Image.png
Created1995-08-15
DescriptionA follow-up report that includes a copy of a USGS quadrangle map, an aerial photograph of the drainage basin, and documentation addressing the 1-hour, 100-year rainfall amount.
42786-Thumbnail Image.png
Created2000-05
Description

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous

This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous peoples of the historical period; and (4) Pima County today.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

42330-Thumbnail Image.png
Created1987 to 1989
Description

Offsite drainage impacts the project site from several watersheds whose headwaters lie to the northeast of the project site. This report will address the manner in which the existing offsite and the post-development onsite drainage will be conveyed across this project.

42345-Thumbnail Image.png
Created1992-01
Description

This study proposes to reduce flood damages from both Tanque Verde Creek and offsite flows, as they affect the Fortyniner's Country Club Estates and the Arbor Vista subdivisions.

42347-Thumbnail Image.png
Created1990-09-12
Description

The purpose of this report is to assist the Pima County Board of Supervisors in assessing whether the Black Wash area requires area-specific flood control policies.