Filtering by
- All Subjects: Watersheds
- All Subjects: Children--Services for
- All Subjects: Tucson (Ariz.)
- All Subjects: Hohokam culture
- Creators: Battelle Memorial Institute. Technology Partnership Practice
This report addresses (1) expenditures for the recruitment, retention, training, licensing, and tracking of homes maintained by foster parents; (2) an assessment of whether the Department’s contract process of home recruitment, study, and supervision is the most appropriate means to provide these services; and (3) best performance measures to evaluate the effectiveness of these services. Although contracting appears to be an appropriate method for obtaining foster home recruitment-related services, the Department should improve how it contracts for these services.
The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.
The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.
Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.
This study was developed to identify the resources and applicable methodology for the delineation of primary flood corridors.
The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.
Originally, the purpose of the study was to obtain either a Letter of Map Revision or a Physical Map Revision from the Federal Emergency Management Agency. Unfortunately, during the initial stages of the investigation, it became apparent that FEMA's guidelines for these types of map revisions could not be accommodated, primarily due to flow-distribution conflicts.
This report is one of several from Statistical Research Inc. written to develop the Cultural and Historic Resources Element of the Sonoran Desert Conservation Plan. Divided into four parts, the report summarizes available information that reflects the experience of (1) ancient peoples of Southern Arizona; (2) indigenous peoples; (3) non-indigenous peoples of the historical period; and (4) Pima County today.
In fiscal year 2013, the Department paid at least $14.6 million for transportation services for child protective services clients. However, the Department does not use performance measurement to manage and evaluate these services, including overseeing contracted transportation providers. The Department should develop and implement a performance measurement system to evaluate these services and ensure that this system provides the necessary data to evaluate the appropriateness and cost-effectiveness of contracting for these services. In addition, although the Department has implemented some procedures to help ensure proper payments to transportation providers for these services, additional steps would help address internal control deficiencies.
Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.