Matching Items (10)
Filtering by

Clear all filters

Created1996 to 2006
Description

The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.

Created2010-09
Description

Pavements represent one of the largest capital investments in Arizona’s aviation system. Timely airport pavement maintenance and rehabilitation are crucial because repairs are much more costly once the condition deteriorates below a certain level. Additionally, airport pavement weaknesses, such as cracks and loose debris, pose a significant safety risk to

Pavements represent one of the largest capital investments in Arizona’s aviation system. Timely airport pavement maintenance and rehabilitation are crucial because repairs are much more costly once the condition deteriorates below a certain level. Additionally, airport pavement weaknesses, such as cracks and loose debris, pose a significant safety risk to aircraft.

43015-Thumbnail Image.png
Created1997-12
Description

The Cochise County Airport is playing an increasing role in the promotion and development of the City of Willcox and the Cochise County area. The master plan has a capital improvement program that responds to the needs and desires for the short and long term aviation forecasts for Cochise County.

42917-Thumbnail Image.png
Created1998-11-05
Description

The Chandler Airpark area encompasses nine square miles surrounding the Chandler Municipal Airport. The area plan provides the City of Chandler with a document that will strategically guide future development in and around the existing airport. The two major goals of this plan are the protection of the Municipal Airport

The Chandler Airpark area encompasses nine square miles surrounding the Chandler Municipal Airport. The area plan provides the City of Chandler with a document that will strategically guide future development in and around the existing airport. The two major goals of this plan are the protection of the Municipal Airport from residential encroachment and the aggressive economic development of the Airpark area.

41933-Thumbnail Image.png
Created2009
Description

An evaluation of Glendale Municipal Airport's capabilities and role, forecast for future aviation demand, and a plan for facilities to meet that demand.

41921-Thumbnail Image.png
Created2010-04
Description

An update to the 1998 Chandler Municipal Airport master plan to make it meet current Federal Aviation Administration and Arizona Department of Transportation requirements as well as anticipated needs of Chandler residents and businesses.

42357-Thumbnail Image.png
Created1988-02-04
Description

This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.

42350-Thumbnail Image.png
Created1989-02-15
Description

Tucson Water's Valley View Reservoir site and Flecha Caida Ranch Estates #9 has experienced numerous drainage-related problems,including inundation, erosion, and limited access during the rainy season. A portion of the reservoir site and approximately one-half of the subdivision are both located in the 100-year flood plain.

42336-Thumbnail Image.png
Created1986 to 1995
Description

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries

This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries for the associated channels.

42273-Thumbnail Image.png
Created2010-08
Description

This update of the Eric Marcus Municipal Airport Master Plan has been undertaken to evaluate the airport’s capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal

This update of the Eric Marcus Municipal Airport Master Plan has been undertaken to evaluate the airport’s capabilities and role, to review forecasts of future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goal of the master plan is to provide systematic guidelines for the airport’s overall development, operation, and ownership.