Matching Items (7)
Filtering by

Clear all filters

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

43011-Thumbnail Image.png
Created2007-06
Description

This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning

This Land Use Survey, conducted for the Cochise County Planning Department, was designed to elicit citizen opinions about the future pattern of growth in Cochise County and land use issues in areas outside of City limits. This project is an initial step in the County’s "Envision 2020: Land Use Planning in Cochise County" process, developed to measure citizen opinions on how growth is currently managed in the County and how to manage future growth.

42939-Thumbnail Image.png
Created2013-06
Description

The Flagstaff Regional Plan 2030: Place Matters (Regional Plan) updated the Flagstaff Area Regional Land Use and Transportation Plan (2001). The vision and goals for the Regional Plan are directed toward creating a cohesive and sustainable land use and development pattern resulting in a contextsensitive and efficient transportation system that

The Flagstaff Regional Plan 2030: Place Matters (Regional Plan) updated the Flagstaff Area Regional Land Use and Transportation Plan (2001). The vision and goals for the Regional Plan are directed toward creating a cohesive and sustainable land use and development pattern resulting in a contextsensitive and efficient transportation system that supports economic development, multimodal transportation, and improved safety and accessibility.

41901-Thumbnail Image.png
Created2014
Description

A statement of the community vision for the 525-square-mile Flagstaff Metropolitan Planning Organization (FMPO) area, which extends west-to-east from Bellemont to Winona, and south-to-north from Kachina Village/Mountainaire to north of the San Francisco Peaks. It is the general plan for the City of Flagstaff, and in county areas, works in

A statement of the community vision for the 525-square-mile Flagstaff Metropolitan Planning Organization (FMPO) area, which extends west-to-east from Bellemont to Winona, and south-to-north from Kachina Village/Mountainaire to north of the San Francisco Peaks. It is the general plan for the City of Flagstaff, and in county areas, works in conjunction with the Coconino County Comprehensive Plan.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.