Matching Items (29)
Filtering by

Clear all filters

Created2013-10
Description

The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while

The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while steering community development and project funding. The study findings will also be incorporated into the Town's Capital Improvement Planning process for the next 5-, 10-, and 20-year time frames.

42909-Thumbnail Image.png
Created1995-07-13
Description

The Chandler Redevelopment Element is an element of the Chandler General Plan and updates the city's 1987 Redevelopment Plan with more emphasis placed on defining the implementation measures.

42910-Thumbnail Image.png
Created2010-01-14
Description

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City intends to see redeveloped, with mixed residential and commercial uses to create a dynamic new “front door” for Chandler. The purpose of these design guidelines is to guide zoning requests within the South Arizona Avenue Corridor to achieve the objectives of the Chandler General Plan. The overall goal of these objectives is to implement the vision for South Arizona Avenue. The guidelines address the major design aspects of new office, retail and residential buildings in the corridor. Design Guidelines are not building or streetscape designs; they provide design direction so that each project’s architectural design will reinforce the City’s strategic intentions as this important area of the city responds to its new role as Chandler’s “front door.” These guidelines also identify streetscape design principles for South Arizona Avenue with the objective of coordinating public and private design in the Corridor.

42911-Thumbnail Image.png
Created2006-10-20
Description

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood

The South Arizona Avenue Entry Corridor Study is prompted by a Mayor and Council goal for redeveloping the section of Arizona Avenue from Pecos Road to Boston Street as a new entryway to downtown from the Santan/Loop 202 Freeway. The plan was created with extensive neighborhood participation,which included six neighborhood meetings and individual meetings with property owners.The comprehensive approach to this study can be broken down into four primary areas: Land Use,Traffic Circulation, Conceptual Design Standards, and Neighborhood Planning.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42501-Thumbnail Image.png
Created1999-10
Description

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and

Construction of a habitat restoration project in the Salt River will begin in the spring of 2000 which will transform the riverbed to provide a variety of amenities including recreation opportunities, improved flood management, riparian vegetation and wildlife habitat. The Beyond the Tanks area surrounds the Rio Salado project and is bounded by I-17 to the north, 32nd Street to the east, Broadway Road to the south and 19th Avenue to the west. The committee has adopted the name "Village at Rio Salado" for this area but will be referred to as "Beyond the Banks" in this report.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

42569-Thumbnail Image.png
Created2003-06-13
Description
This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues

This document reports the Steering Committee’s recommendations on issues related to Pima County’s ESA Section 10 permit application and the associated MSHCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP. With a few exceptions, it does not address the issues associated with the other elements of the SDCP.
Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.