Filtering by
- All Subjects: Hydrology
- All Subjects: Coconino County (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
A detailed hydraulic analysis of Idle Hour Wash for the purpose of preparing a Letter of Map Revision.
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
The collaborative process for developing the Tusayan Community Wildfire Protection Plan began May 5, 2004 at a Tusayan/Grand Canyon Chamber of Commerce Board meeting in Tusayan. A CWPP is developed to assist local fire districts, local governmental agencies and residents in the identification of lands—including federal lands—at risk from severe wildfire threat and to identify strategies for reducing fuels on wildlands while improving forest health, supporting local economies, and improving firefighting response capabilities.
The Coconino County Parks and Recreation Department (CCPR) contracted with PROS Consulting to develop an Organizational Master Plan that would aid the Department in sustaining a high quality park and recreation system over the next 10 years. This project seeks to provide sound and realistic recommendations, strategies, tactics, and suggested initiatives that address current and evolving park and recreation needs of residents of Coconino County.
A statement of the community vision for the 525-square-mile Flagstaff Metropolitan Planning Organization (FMPO) area, which extends west-to-east from Bellemont to Winona, and south-to-north from Kachina Village/Mountainaire to north of the San Francisco Peaks. It is the general plan for the City of Flagstaff, and in county areas, works in conjunction with the Coconino County Comprehensive Plan.
In fiscal year 2011, McNeal Elementary School District’s student AIMS scores were lower than or similar to peer districts’ averages. Although per pupil costs were high in some operational areas, the District was relatively efficient overall. McNeal ESD’s per pupil administrative costs were higher than the peer districts’ average, but only because the District served fewer students. The District’s food service program also had higher per pupil costs, but its cost per meal was similar to the peer districts’ average. However, the District subsidized its food service program with $23,000 that otherwise potentially could have been spent in the classroom. In addition, McNeal ESD’s plant operations and transportation program were both reasonably efficient, with lower costs per square foot and per mile, respectively. McNeal ESD paid a neighboring district to transport high school students living within McNeal ESD’s boundaries. As allowed by law, both districts received full funding for the route miles. Lastly, the District needs to strengthen some of its purchasing and computer controls.
This report is being submitted for the purpose of reducing the erosion setback limits. The information contained herein supports the claim that a safe reduction in the setback distance can occur.
Millstone Manor #6 is a subdivision that was recorded in the mid-1950's. All records indicate no engineering took place with regards to potential for drainage improvements. This report will address what the natural floodprone areas are and will recommend how future permits should be processed.
This report describes the hydrologic and hydraulic analysis. Development in the lower end of the watershed has occurred without knowledge of the floodplain's characteristics.
This parcel has some houses already constructed, but most of the area is left undeveloped and can be classified as desert foothills. The objective of this report is to determine all of the flows generated by a 100-year storm in excess of 100 cfs and then map the flood-prone boundaries for the associated channels.