Matching Items (11)
Filtering by

Clear all filters

Created2013-08
Description

Santa Cruz County was awarded funding from the Arizona Department of Transportation Planning Assistance for Rural Areas program to prepare the Rio Rico Walking and Biking Study. The purpose of the Study is to enable Santa Cruz County to establish a program for the construction of bike lanes and sidewalks

Santa Cruz County was awarded funding from the Arizona Department of Transportation Planning Assistance for Rural Areas program to prepare the Rio Rico Walking and Biking Study. The purpose of the Study is to enable Santa Cruz County to establish a program for the construction of bike lanes and sidewalks that are desired to provide safe and convenient pedestrian and bicycle access and connectivity to select Santa Cruz Valley Unified School District No. 35 facilities as well as use for the general public for transportation and recreational purposes.

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2012-05
Description

The Pima Regional Trail System Master Plan is intended to serve as a blueprint for the development of a high quality, interconnected, multimodal, regional trail system in eastern Pima County. The plan is an update of the 1989 and 1996 Eastern Pima County Trail System Master Plans.

Created2003-04
Description

A statement of the City of Scottsdale's plan for a functional network of 286 miles of non-motorized, unpaved, multi-use trails to respond to public needs.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

Created2012-11
Description

The Pinal Creek Trail corridor study is being conducted in conjunction with the Cobre Valley Comprehensive Transportation Study, to provide alternative modes of transportation to key educational and recreational areas in the Globe area. The purpose of the study is to review previous trail studies and recreation trail plans that

The Pinal Creek Trail corridor study is being conducted in conjunction with the Cobre Valley Comprehensive Transportation Study, to provide alternative modes of transportation to key educational and recreational areas in the Globe area. The purpose of the study is to review previous trail studies and recreation trail plans that will address the most critical current and future non-motorized modes of transportation within the study area. The concept of turning Pinal Creek, which runs through the City, into a functioning urban greenbelt, has long been the dream of several citizens of the community.

Created2001-12
Description

Pima County, in partnership with the National Park Service, has been an active participant in the development of a 70 mile segment of the trail. With the preparation of this Master Plan, Pima County has embarked on an active program to acquire the necessary rights-of-way and easements and to construct

Pima County, in partnership with the National Park Service, has been an active participant in the development of a 70 mile segment of the trail. With the preparation of this Master Plan, Pima County has embarked on an active program to acquire the necessary rights-of-way and easements and to construct the Pima County segment of the national historic trail.

41896-Thumbnail Image.png
Created2012-01
Description

A summary of a survey taken in July 2011 of users of the Flagstaff Urban Trails System. The City of Flagstaff will use the results to collect demographic data on trail users, determine patterns of use, and identify specific locations for new trails and trail improvements.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.