Matching Items (20)
Filtering by

Clear all filters

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.

Created2014-03-14
Description

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on

The Arizona Department of Transportation, in coordination with Apache County District II and the Fort Defiance Chapter of the Navajo Nation, analyzed the traffic circulation conditions of Navajo Routes 7, 12, 54, 110, and 112 within the Fort Defiance Industrial Area which is designated as a major growth area on the Navajo Nation. The study was funded by the Federal Highway Administration’s State Planning and Research Program and administered through ADOT’s Multimodal Planning Division's Planning Assistance for Rural Areas (PARA) program. The study was initiated to develop a planning strategy to improve the mobility and safety within the Fort Defiance Industrial Area.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42935-Thumbnail Image.png
Created2009-12-31
Description

The San Xavier District of the Tohono O’odham Nation is home to approximately 2,000 people. Numerous others come to the District to visit the San Xavier del Bac Mission Church. The San Xavier District Pedestrian Access and Safety Study is being prepared to improve the walking and bicycling environment on

The San Xavier District of the Tohono O’odham Nation is home to approximately 2,000 people. Numerous others come to the District to visit the San Xavier del Bac Mission Church. The San Xavier District Pedestrian Access and Safety Study is being prepared to improve the walking and bicycling environment on the San Xavier District for Community members and visitors alike. The study is being funded by the Arizona Department of Transportation Multimodal Planning Division’s Planning Assistance for Rural Areas program.

41876-Thumbnail Image.png
Created2014-08
Description

A study of a sample of individuals who contacted the Scottsdale Convention and Visitors Bureau from April 2013 to March 2014, to determine their travel patterns (length of stay, activities during stay, trip spending, etc.) and demographics.

Created2008-05
Description

Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.

Created2008 to 2009
Description

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen

Fort Lowell was a supply base for the United States Army “Apache Campaigns” between 1873 and 1891. Following abandonment of the fort in 1891, settlers moved in and used some fort buildings as residences, or stripped the buildings of useful materials. By the 1930s, much of the fort had fallen into disrepair or had been sold off. Eventually, the City of Tucson acquired a large portion of the old fort which became what is today’s “Fort Lowell Park.” A 5.2 acre (“Adkins”) parcel of the former fort containing several original adobe buildings was still in private ownership, and the 2004 County bond election passed a proposal to acquire the land and preserve the historic resources.

42189-Thumbnail Image.png
Created2007-08
Description

Following the completion of the 2005 report, an Act was passed that contained a number of important new and continued funding sources for safety related projects, programs, and initiatives. This required every state to develop a Strategic Highway Safety Plan. This 2007 report represents Phase 1, Development Plan and is

Following the completion of the 2005 report, an Act was passed that contained a number of important new and continued funding sources for safety related projects, programs, and initiatives. This required every state to develop a Strategic Highway Safety Plan. This 2007 report represents Phase 1, Development Plan and is a comprehensive, collaborative, high level, statewide safety strategy that will guide Arizona's safety change initiative. The Arizona Department of Transportation was assigned the role of project manager for this SHSP phase by the Governor's Traffic Safety Advisory Council.