Matching Items (18)
Filtering by

Clear all filters

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42459-Thumbnail Image.png
Created2014-04
Description

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have

In fiscal year 2012, Clifton Unified School District’s student AIMS scores were lower than both its peer districts’ and state averages. The District’s instructional program needs improvement. For example, some students were not provided the statutorily required number of instructional hours, and one of its four teachers did not have a teaching certificate. The District’s operational efficiencies were mixed, with some costs higher and some costs lower than peer districts’. However, the District lacked proper oversight and adequate controls over nearly all of its operations. In particular, the District lacked basic administrative processes such as monitoring budgets and maintaining proper controls over expenditures resulting in it overspending its legal budget limits in fiscal years 2009, 2010, and 2011. The District also failed to meet several transportation safety requirements. For example, its primary driver was not certified to drive a school bus. Lastly, the District lacked proper supervision of inmate workers on its school campus.

42936-Thumbnail Image.png
Created2010-03
Description

The Planning Assistance for Rural Areas program is sponsored by the Arizona Department of Transportation Multimodal Planning Division, and provides federal funds for the purpose of conducting transportation planning studies. Lake Havasu City first participated in another ADOT program for local governments, the Small Area Transportation Study program, in 1991.

The Planning Assistance for Rural Areas program is sponsored by the Arizona Department of Transportation Multimodal Planning Division, and provides federal funds for the purpose of conducting transportation planning studies. Lake Havasu City first participated in another ADOT program for local governments, the Small Area Transportation Study program, in 1991. Under the SATS program the Lake Havasu City government successfully developed a citywide roadway plan, and then took part in the SATS program to update the plan in 1997 and 2005. The PARA program is flexible and allows for studies of neighborhoods or sub-areas within jurisdictions. The subarea program provision made it possible for the City to apply for and receive PARA funding for the North Havasu Study Area.

42942-Thumbnail Image.png
Created2011-08-31
Description

In October 2009, the San Carlos Apache Tribe completed an update to their Long-Range Transportation Plan. One of the recommendations from the LRTP was for the Tribe to conduct an extensive transit feasibility study to evaluate the existing services and identify improvement opportunities. In addition, the Tribe is seeking support

In October 2009, the San Carlos Apache Tribe completed an update to their Long-Range Transportation Plan. One of the recommendations from the LRTP was for the Tribe to conduct an extensive transit feasibility study to evaluate the existing services and identify improvement opportunities. In addition, the Tribe is seeking support in preparing the required documentation to assist in the development of Federal and State transit funding grants. The San Carlos Apache Transit Services applied for, and received funding from the ADOT Multimodal Planning Division to conduct the Transit Feasibility Study. This Five-year Implementation Plan represents the second phase of the Study.

42943-Thumbnail Image.png
Created2011-08-31
Description

In October 2009, the San Carlos Apache Tribe completed an update to their Long-Range Transportation Plan. One of the recommendations from the LRTP was for the Tribe to conduct an extensive transit feasibility study to evaluate the existing services and identify improvement opportunities. The San Carlos Apache Transit Services applied

In October 2009, the San Carlos Apache Tribe completed an update to their Long-Range Transportation Plan. One of the recommendations from the LRTP was for the Tribe to conduct an extensive transit feasibility study to evaluate the existing services and identify improvement opportunities. The San Carlos Apache Transit Services applied for, and received Planning Assistance for Rural Areas program funding from the Arizona Department of Transportation Multimodal Planning Division to conduct the Transit Feasibility Study. The study consists of two separate phases: The first phase focuses on the feasibility of expanding and enhancing the San Carlos Apache Transit Services operation, and the second phase is the development of a five-year plan for implementing the recommended enhancements and service expansion. This is the Final Report for the first phase of the study.

42947-Thumbnail Image.png
Created2009-08
Description

The purpose of the study was to develop a multimodal transportation plan that outlines the City’s transportation priority projects. The transportation plan created a path to help the City achieve its vision and goals for a future transportation system in a manner that is closely aligned with the lifestyle and

The purpose of the study was to develop a multimodal transportation plan that outlines the City’s transportation priority projects. The transportation plan created a path to help the City achieve its vision and goals for a future transportation system in a manner that is closely aligned with the lifestyle and the values of the community. Additionally, it will address the City of San Luis mobility needs for the future population, commercial growth, the transportation needs due to the opening of the new San Luis commercial Port of Entry, and the reconfiguration of the original San Luis Port of Entry I. The City of San Luis Small Area Transportation Study is a joint effort of the City of San Luis and Arizona Department of Transportation.

42928-Thumbnail Image.png
Created1999-09
Description

The primary goals of the study are to define the current circulation system, evaluate its performance, forecast future needs, and prepare a plan for fulfilling the identified needs. The study is prepared for the Town of Sahuarita, pursuant to an intergovernmental agreement with the Arizona Department of Transportation through the

The primary goals of the study are to define the current circulation system, evaluate its performance, forecast future needs, and prepare a plan for fulfilling the identified needs. The study is prepared for the Town of Sahuarita, pursuant to an intergovernmental agreement with the Arizona Department of Transportation through the auspices of ADOT's small area transportation studies program. The Town of Sahuarita General Plan was adopted in November 1996 to guide development within the town and its sphere of influence. The circulation element contained in the General Plan identifies specific objectives for consideration in the planning and development process.

42929-Thumbnail Image.png
Created2008-10-16
Description

The Town of Superior Small Area Transportation Study was initiated by the Town of Superior in conjunction with the Arizona Department of Transportation. The purpose of this study is to document existing roadway characteristics and operations, land use and socioeconomic conditions, and other existing transportation modes, and to craft a

The Town of Superior Small Area Transportation Study was initiated by the Town of Superior in conjunction with the Arizona Department of Transportation. The purpose of this study is to document existing roadway characteristics and operations, land use and socioeconomic conditions, and other existing transportation modes, and to craft a long-range transportation plan to meet the transportation needs of the Town of Superior. A travel demand model was prepared to forecast traffic volumes to assist in identifying the traffic impacts with the anticipated growth in and around the City.

42214-Thumbnail Image.png
Created2013-06
Description

This manual provides an overview of Sections 404 and 401 of the Clean Water Act as they apply to Arizona Department of Transportation activities. Compliance with Sections 404 and 401 is necessary for Arizona Department of Transportation activities that involve the discharge of dredged or fill material into waters of

This manual provides an overview of Sections 404 and 401 of the Clean Water Act as they apply to Arizona Department of Transportation activities. Compliance with Sections 404 and 401 is necessary for Arizona Department of Transportation activities that involve the discharge of dredged or fill material into waters of the United States. The manual also provides general guidance on the preparation of jurisdictional delineations, Nationwide Permit Pre-Construction Notification submittals, and Individual Permit applications.