Description

In October 2009, the San Carlos Apache Tribe completed an update to their Long-Range Transportation Plan. One of the recommendations from the LRTP was for the Tribe to conduct an extensive transit feasibility study to evaluate the existing services and

In October 2009, the San Carlos Apache Tribe completed an update to their Long-Range Transportation Plan. One of the recommendations from the LRTP was for the Tribe to conduct an extensive transit feasibility study to evaluate the existing services and identify improvement opportunities. The San Carlos Apache Transit Services applied for, and received Planning Assistance for Rural Areas program funding from the Arizona Department of Transportation Multimodal Planning Division to conduct the Transit Feasibility Study. The study consists of two separate phases: The first phase focuses on the feasibility of expanding and enhancing the San Carlos Apache Transit Services operation, and the second phase is the development of a five-year plan for implementing the recommended enhancements and service expansion. This is the Final Report for the first phase of the study.

Downloads
pdf (4.8 MB)

Details

Title
  • San Carlos Apache Tribe Transit Feasibility Study: Final Report
Date Created
2011-08-31
Resource Type
  • Text
  • Identifier
    • Identifier Value
      TRT 5.2:S 15/3
    Note
    • Includes bibliographical references (p. 70).

    Machine-readable links