Filtering by
- All Subjects: Grand Canyon National Park (Ariz.)
- All Subjects: Arizona
- Creators: United States Geological Survey
- Creators: ARE Inc.
This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.
Geological examination of the park canyonland, with description of the rocks, water sculping process, volcanic cones and outflows, and land erosion. This edition is Volume 2, 1977 reprint, of the author's 1882 monograph. Includes 12 color maps, 10 color views and is number 280/1500.