Matching Items (31)
Filtering by

Clear all filters

Created2013-10
Description

The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while

The primary purpose of this study was to develop a plan that enables the Town to facilitate safer and more efficient infrastructure for the traveling public and guide the development of the Business District. This study recommends phased improvement projects to address the multimodal transportation needs of the community, while steering community development and project funding. The study findings will also be incorporated into the Town's Capital Improvement Planning process for the next 5-, 10-, and 20-year time frames.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42480-Thumbnail Image.png
Created1993-09-17
Description

This document has been prepared to fulfill the requirements for a hydraulic study for the Cave Creek Landfill operated by Maricopa County.

42481-Thumbnail Image.png
Created2005-08-26
Description

During the period of 1965 through 1984, Maricopa County operated a landfill leased from the U.S. Bureau of Land Management. In 1982 the County leased a separate parcel from the State for the development of a new landfill. The landfill stopped accepting waste in 1998.

42482-Thumbnail Image.png
Created2005-07-08
Description

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE,

To evaluate whether VOCs are migrating out of the landfills into the vadose zone, a soil vapor survey of the soil beneath the landfill bases was performed. Permanent vapor monitoring probes were installed and then sampled twice for VOCs. Groundwater beneath the landfills has been impactd by VOCs, namely TCE, DCE, and toluene.

42484-Thumbnail Image.png
Created2012-11-19
Description

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent

This Additional Site Characterization Work Plan presents a strategy for collecting site characterization information at the closed Maricopa County Cave Creek Landfill to support ongoing remedial action planning for trichloroethene-impacted groundwater underlying the site. The Work Plan supplements previous remedial investigation work plans prepared to characterize the nature and extent of site contamination.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42496-Thumbnail Image.png
Created2008-07-08
Description

Wilson & Company recently completed the City of Casa Grande Small Area Transportation Study. The SATS notes that “as the City of Casa Grande increases in size and planning area, the roadway network is also growing to meet the additional travel demands significant improvement measures are needed to meet the

Wilson & Company recently completed the City of Casa Grande Small Area Transportation Study. The SATS notes that “as the City of Casa Grande increases in size and planning area, the roadway network is also growing to meet the additional travel demands significant improvement measures are needed to meet the travel demand generated by forecast population and employment growth”. Given the findings of the SATS, the City of Casa Grande contracted with TischlerBise to calculate an infrastructure improvement plans and updated development fees for transportation.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42948-Thumbnail Image.png
Created2012-01-20
Description

The purpose of this study is to prepare a pedestrian circulation plan for the City of Nogales in the vicinity of and serving the three Nogales Ports of Entry. These ports are the DeConcini and Morley Gate Ports of Entry in downtown Nogales and the Mariposa Port of Entry to

The purpose of this study is to prepare a pedestrian circulation plan for the City of Nogales in the vicinity of and serving the three Nogales Ports of Entry. These ports are the DeConcini and Morley Gate Ports of Entry in downtown Nogales and the Mariposa Port of Entry to the west at SR 189.