Matching Items (139)
Filtering by

Clear all filters

115498-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body)
Created2011-03
Description

The Arizona State Rail Plan (SRP) is the first comprehensive assessment of the stateís rail needs and was initiated in response to the increasing involvement by ADOT in freight and passenger rail issues. The SRP serves to identify the current rail system, to determine infrastructure needs, and to have rail

The Arizona State Rail Plan (SRP) is the first comprehensive assessment of the stateís rail needs and was initiated in response to the increasing involvement by ADOT in freight and passenger rail issues. The SRP serves to identify the current rail system, to determine infrastructure needs, and to have rail projects included in the state's long-range planning processes to improve regional and statewide safety mobility. The principle purpose is to convey the magnitude of the rail needs in the state and set forth a policy framework through which strategic actions can be taken to realize the full potential of passenger and freight rail transportation.

42403-Thumbnail Image.png
Created2010
Description

The Arizona Department of Transportation directs control of impacts to stormwater via a Statewide Stormwater Management Plan, and a statewide stormwater individual permit. The Maintenance and Facilities Best Management Practices Manual is one component of this Plan.

117470-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body) / Coconino County (Ariz.) (Issuing body) / Burgess & Niple (Publisher)
Created2015-10
Description

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private

Bellemont is a rural, unincorporated community with a population of approximately 1,000 residents in Coconino County that has become a suburb of Flagstaff, where residents commute to work. Three roads ó Interstate 40 (I-40), Brannigan Park Road and Shadow Mountain Drive ó are used to access virtually all the private land north of I-40 at Bellemont. Frequent congestion from heavy truck volumes and subdivision traffic causes traffic delays and creates concern for safety and timely emergency response. The 2008 closure of the ADOT Parks Rest Area on I-40, just west of Bellemont, has also increased vehicular traffic accessing the truck stop and restaurants. Future build-out of the subdivision and potential commercial/industrial uses in the area are expected to continue to negatively affect the Brannigan Park Road and Shadow Mountain Drive intersection and the I-40 traffic interchange. ADOT recently prepared the I-40 Bellemont to Winona Initial Design Concept Report, which recommended long-term improvements for the intersection and traffic interchange.

Ultimately, this access management and multimodal transportation study will provide a comprehensive review of the Bellemont area transportation system and provide guidance for determining priority needs for future improvements north of I-40, including alleviating congestion and improving/managing access, and improving and evaluating multimodal access to businesses from residential areas.

117477-Thumbnail Image.png
Created2015-07
Description

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services.

The Ganado-Burnside Area is a rural community located on the Navajo Nation in northeastern Arizona. Ganado was formally established in 1901 as the location for a Presbyterian Church Mission, a school and hospital. Later the community served as a center to distribute various types of Bureau of Indian Affairs services. Today, the community area serves as a major center for housing, education, health and government operations. Also in the Burnside area, the Ganado School District recently established a new high school and sports venue to accommodate track and field, baseball, and basketball activities.

There are four main roadway corridors that intersect the study area: State Route 264, US Route 191, Navajo Route 27 and Navajo Route 15. There are also county gravel roads and private and community dirt roads that intersect SR 264, the main traffic corridor. Within these routes there is substantial multimodal activity generated from the area schools, medical facilities, transit operations, government entities, utility providers and social programs. The principal focus of this study project is to address the most critical transportation planning needs identified by the Ganado Chapter and Apache County. This will include, but is not limited to, a comprehensive needs analysis of multimodal movements and traffic circulation as well as safety issues for the project area corridors. The major product of the study will be a final report, which contains a Plan for Improvements. Taking into consideration received public input, the Plan will span over five-, 10- and 20-year periods, incorporating both roadways and the multimodal needs of the area.

The Ganado-Burnside Area Traffic Circulation Study will also be conducted according to a cooperative planning process that involves stakeholders that include public agency staff, elected tribal officials and tribal community members. Throughout the study, information will be presented to and solicited from stakeholders through individual interviews and to the general public through public meetings and other means of communication.

117491-Thumbnail Image.png
Created2013-07
Description

The Arizona Department of Transportation, through its Multimodal Planning and Communications divisions, collaborated with the town of Queen Creek to conduct a transportation study of the Germann Road corridor. The study, which is funded through the Planning Assistance for Rural Areas (PARA) program, was completed in July 2013.

118014-Thumbnail Image.png
Created2010-10
Description

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water

A comprehensive research program for the characterization of storm water runoff from an Arizona highway was conducted from January through December 2007. The study area covered a portion of the Loop 202 freeway west of Mesa Drive to a retention basin east of Lindsay Road in Mesa, Arizona. Storm water samples were collected from two storm water detention basins and a discharge point to the Salt River. The study was conducted by manually collecting storm water samples with passive automatic samplers and analyzing them for various roadway constituents. A primary objective of this research effort was to establish baseline values of constituents in ADOT highway runoff, aiding in the evaluation of related best management practices. A total of 16 storm water samples was collected from the research area between January 2007 and December 2007.

118016-Thumbnail Image.png
Created1992-12
Description

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.