Skip to metadata.
Document
Download Options
Name Type Format Size
SPS-5 and SPS-6 SHRP Data Collection: Final Report Original File
614.04 KB
118016-Extracted Text.txt Extracted Text
Unknown size

Details

Title
  • SPS-5 and SPS-6 SHRP Data Collection: Final Report
Description

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete

This project required the completion of Construction Data Forms for the Strategic Highway Research Program's (SHRP's) Specific Pavement Studies (SPS) Experiment Number 5, The Rehabilitation of Asphalt Concrete Pavements, and Experiment Number 6, The Rehabilitation of Jointed Portland Cement Concrete Pavements. In Arizona, the SPS-5 experiment construction was done in the eastbound travel lane of Interstate Highway 8, between mileposts 159 and 161 in southwestern Arizona. Eleven test sections were constructed for the experiment, with eight as set forth in SHRP guidelines. In addition, two additional sections were constructed, and one designated as the control section, for a grand total of eleven sections.

Date Created
1992-12
Resource Type
  • Text
  • Note
    • numbering
      Report number: FHWA-AZ92-379-I
    • date
      December 1992

    Citation and reuse

    Statement of Responsibility

    Prepared by:
    Austin Research Engineers, Inc.

    Prepared for:
    Arizona Department of Transportation
    in cooperation with
    U.S. Department of Transportation
    Federal Highway Administration

    Machine-readable links

    Share this content