Description

The Arizona Department of Transportation (ADOT), through the Planning Assistance for Rural Areas (PARA) program, awarded funding to Yuma School District One to prepare the Multimodal Planning Study. The Yuma School District One Multimodal Planning Study will focus on the

The Arizona Department of Transportation (ADOT), through the Planning Assistance for Rural Areas (PARA) program, awarded funding to Yuma School District One to prepare the Multimodal Planning Study. The Yuma School District One Multimodal Planning Study will focus on the comprehensive evaluation of the daily transportation habits, needs and safety concerns of 15 elementary and middle schools in the Yuma School District One boundaries.

The purpose of the Yuma School District One Multimodal Planning Study is to enable Yuma School District One to evaluate the existing student drop-off/pickup areas, bus routes, pedestrian routes and bicycle routes at each of the 15 school campus locations to enhance the safety and convenience of access for all modes of transportation for each school site.

Reuse Permissions
  • Downloads
    pdf (43.1 MB)

    Details

    Title
    • Yuma School District One Multimodal Planning Study: Final Report
    Date Created
    2014
    Resource Type
  • Text
  • Identifier
    • Identifier Type
      Arizona Documents Classification System (AZDOCS)
      Identifier Value
      TRT 5.2:Y 85/4
    Note
    • MPD 002-14

    Citation and reuse

    Statement of Responsibility

    Prepared for Yuma Elementary School District
    and
    Arizona Department of Transportation

    Prepared by Baker

    Machine-readable links