Description
A contract between Melitin, a Chinese settler, and la Compania de Caminos de Hierro. The contract was to last for six months and lists the legal requirements of both the employee and the employer. Notes that Melitin completed a contract

A contract between Melitin, a Chinese settler, and la Compania de Caminos de Hierro. The contract was to last for six months and lists the legal requirements of both the employee and the employer. Notes that Melitin completed a contract previously. Signed by Manuel Barque and Melitin, who signed in Chinese.
Downloads
pdf (3.9 MB)

Details

Title
  • Contract
Contributors
Date Created
1869
Resource Type
  • Text
  • Identifier
    • Identifier Type
      Locally defined identifier
      Identifier Value
      Melikian1084

    Machine-readable links