Engineering Analysis and Recommendations for Green Valley Drainageway #9
Document
Description
This report presents the results of an engineering analysis performed to assess the existing potential for flooding and erosion along Green Valley drainageway #9 and presents conceptual plans for recommended improvements. This study extends from La Canada Drive at the downstream end to the La Canoa Land Grant Boundary at the upstream end.