Arizona State and Local Government Documents Collection
The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.
The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.
Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.
Filtering by
- Creators: Parsons Brinckerhoff
- Creators: L. William Seidman Research Institute
- Creators: Gilbert (Ariz.)
Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change as the regional transit network develops over the life of the 20 year transit program.
The 2016 College Football Playoff National Championship Game was held on January 11, 2016, in Glendale, Arizona. The W. P. Carey School of Business at Arizona State University was commissioned to conduct an economic impact assessment of the Game and events surrounding it, including the impact of direct and indirect visitor and organizational expenditures. This study utilized multiple research, survey and analytical methodologies. This report will outline the methodologies used and the results obtained in the study and the economic impact.
This study examines the economic impact of the Central Arizona Project (CAP) to the State of Arizona in two aspects: the construction of CAP, 1973‐1993; and the impact of CAP's water supply delivery operations, 1986‐2010. A modified IMPLAN input‐output model for the State of Arizona is used to implement both analyses. The economic impacts for each analysis are assessed in terms of gross state product (GSP) and employment.
The Arizona Department of Transportation, through its Multimodal Planning and Communications divisions, collaborated with the town of Queen Creek to conduct a transportation study of the Germann Road corridor. The study, which is funded through the Planning Assistance for Rural Areas (PARA) program, was completed in July 2013.
Linking the Long-Range Plan and Construction Program: P2P Link Methodologies and Implementation Plan
Planning to Programming Link development started with ADOT's multimodal visioning called "Building a Quality Arizona" (bqAZ), the 2010 Statewide Transportation Planning Framework Study created a fiscally-unconstrained vision for the state's transportation system in 2050. bqAZ led to "What Moves You Arizona?," the state's Long-Range Transportation Plan 2010-2035, which applied financial constraint to the vision, identifying anticipated revenues and providing a recommended investment choice (RIC) that indicates how revenues will be allocated to four different investment types: preservation, expansion, modernization, and non-highway. The third step, and subject of this report, is "Linking the Long-Range Plan and Capital Improvement Program," or P2P Link, which focuses on how ADOT and its primary business partners, the Federal Highway Administration (FHWA), Metropolitan Planning Organizations (MPOs), and Councils of Governments (COGs), fund, build, maintain and operate the transportation system.
This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.
Outlines Gilbert's community goals for its physical, economic, and social development and provides a decision-making guide for the future.
The plan identifies and prioritizes any and all known and future capital needs of the community which are to be constructed with public funds.
The budget includes a profile of Gilbert and its government, a financial overview, details of operating and non-operating funds, capital improvement, and the town's debt.