The State and Local Arizona Documents (SALAD) collection contains documents published by the State of Arizona, its Counties, incorporated Cities or Towns, or affiliated Councils of Government; documents produced under the auspices of a state or local agency, board, commission or department, including reports made to these units; and Salt River Project, a licensed municipality. ASU is a primary collector of state publications and makes a concerted effort to acquire and catalog most materials published by state and local governmental agencies.

The ASU Digital Repository provides access to digital SALAD publications, however the ASU Libraries’ non-digitized Arizona documents can be searched through the ASU Libraries Catalog. For additional assistance, Ask A Government Documents Librarian.

Publications issued by the Morrison Institute for Public Programs at Arizona State University are also available in PRISM, in the Morrison Institute for Public Policy - Publications Archive collection.

Displaying 1 - 10 of 54
Filtering by

Clear all filters

Created2006 to 2008
Description

The Project is responsible for the design and construction of a 19.6 mile, double track system. These reports offer a month-by-month progress report.

ContributorsValley Metro Rail (Author)
Created2009 to 2016
Description

METRO's management is responsible for establishing and maintaining an internal control structure designed to ensure that the assets of METRO are protected from loss, theft, or misuse and to ensure that adequate accounting data are compiled to allow for the preparation of financial statements.

42452-Thumbnail Image.png
Created2008
Description

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character

Recognizing that public art is an integral element to the success of the system, METRO was proud to incorporate artists in the design process from the very start. The public art that resulted from this process is a celebration of place and community. Each station boasts its own unique character with artwork that strives to add substance, style and even a touch of whimsy to the transit experience.

42491-Thumbnail Image.png
Created2012-10-05
Description

We are pleased to present a first draft of a Five-Year Strategic Transit Plan for input and review. Your comments and suggestions on the Plan will ensure that transit meets the travel and mobility needs of the Tucson area. Once you have provided your input we will make revisions and

We are pleased to present a first draft of a Five-Year Strategic Transit Plan for input and review. Your comments and suggestions on the Plan will ensure that transit meets the travel and mobility needs of the Tucson area. Once you have provided your input we will make revisions and issue a final Five-Year Transit Strategic Plan. The Transit Task Force sees this plan as a working document which provides a framework for monitoring the progress of transit in our community. The Plan does not directly answer all your questions or address all of your concerns, but it does outline additional tasks needing to be completed to do so. Thus the Transit Task Force requests that it be given permanent status to ensure continuity in the transit planning and review process, and enabling it to further develop policies identified in the Plan as needing more work.

42492-Thumbnail Image.png
Created2008-03
Description

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections

The purpose of this report is to present the conceptual study results and recommendations for potable water and reclaimed water infrastructure requirements in the HAMP planning area. A second report has already been prepared with study results and recommendations for wastewater facilities. The projected land use assumptions and population projections used in this potable and reclaimed water conceptual plan are consistent with Pima County's Plan.

42503-Thumbnail Image.png
Created2004-12
Description

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning

The initial step in the Master Plan Update for Tucson International Airport is the identification of a series of goals and objectives that will establish guidelines for the planning process. These goals and objectives reflect the input of the Tucson Airport Authority, the Long Range Planning Council, the Airport’s Planning Advisory Committee, and the Airport’s Consultants. The Goals and Objectives will ultimately form the framework for evaluating the recommended long-range development plan and ensuring that the on-going development of the airport is consistent with the airport’s overall strategic objectives.

42504-Thumbnail Image.png
ContributorsTucson Airport Authority (Publisher)
Created2013-03
Description

This is the sixth update of the original Master Plan first drafted in 1974. While the Master Plan Update addresses traditional master planning elements, including updating the inventory, establishing future facility requirements and preparing an updated Airport Layout Plan, the study’s key focus areas relate to modernization of the airfield

This is the sixth update of the original Master Plan first drafted in 1974. While the Master Plan Update addresses traditional master planning elements, including updating the inventory, establishing future facility requirements and preparing an updated Airport Layout Plan, the study’s key focus areas relate to modernization of the airfield through strategic development, including relocation and expansion of the TIA’s parallel runway.

42982-Thumbnail Image.png
Created2013-06
Description

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the

In fiscal year 2011, Chino Valley Unified School District’s student achievement was similar to peer district and state averages, and its operational efficiencies were mixed with some costs higher and some costs lower than peer districts’ averages. The District’s per-pupil administrative costs were slightly higher than peer districts’ because the District employed more administrative positions per pupil. The District’s plant operations, food service, and transportation programs operated reasonably efficiently, with cost measures such as cost per square foot, cost per meal, and cost per mile that were similar to or lower than peer districts’ averages. However, the District needs to improve controls over access to critical information systems and strengthen controls over its fuel purchase cards.

42934-Thumbnail Image.png
Created2013-09
Description

In fiscal year 2011, Elfrida Elementary School District’s student AIMS scores for reading and writing were similar to the peer districts’ averages, and its math scores were lower. The District’s operational efficiencies compared favorably to peer district averages in most areas. All of the District’s nonclassroom areas operated with lower

In fiscal year 2011, Elfrida Elementary School District’s student AIMS scores for reading and writing were similar to the peer districts’ averages, and its math scores were lower. The District’s operational efficiencies compared favorably to peer district averages in most areas. All of the District’s nonclassroom areas operated with lower per pupil costs than peer districts’ averages and were reasonably efficient overall considering the District’s small size. However, the District’s transportation cost per mile was 59 percent higher than the peer districts’ average, partly because of slightly higher staffing levels. Providing transportation services cooperatively with neighboring districts could help bring costs closer to the peer district average. Further, the District needs to strengthen its accounting and computer controls.