Matching Items (55)
43305-Thumbnail Image.png
Created2005
Description

This health consultation evaluates results of irrigation well samples collected by the Arizona Department of Environmental Quality in October 2003. Previous results obtained by the Blue Ridge Elementary School District in the summer of 2003 indicated trichloroethylene levels above the U.S. Environmental Protection Agency’s Maximum Contaminant Level. In addition, the

This health consultation evaluates results of irrigation well samples collected by the Arizona Department of Environmental Quality in October 2003. Previous results obtained by the Blue Ridge Elementary School District in the summer of 2003 indicated trichloroethylene levels above the U.S. Environmental Protection Agency’s Maximum Contaminant Level. In addition, the most recent (2002) Annual Water Quality Report from the drinking water supplier, Arizona Water Company, was reviewed. A previous health consultation (Blue Ridge Elementary School, Lakeside, Navajo County, Arizona Health Consultation-April 30, 2003) reviewed environmental conditions at Blue Ridge Elementary School. Parents and school staff were concerned that environmental exposures were causing students to be absent from school. Drinking water quality reports, indoor air quality data, food safety, environmental sanitation records, student attendance rates, and the results of an annual parent satisfaction survey were evaluated in the consultation. Arizona Department of Health Services concluded that environmental conditions at Blue Ridge Elementary School posed no apparent public health hazard, and that attendance rates were similar to statewide attendance rates. As part of the 2003 health consultation, ADHS requested that the school district conduct water sampling from the on-site irrigation water wells for the school grounds. Those sampling results were not available when the 2003 health consultation was completed.

43307-Thumbnail Image.png
Created2005-11-16
Description

The purpose of this health consultation is to evaluate the air monitoring conducted by the Arizona Department of Environmental Quality at Mary McLeod Bethune School (Phoenix, AZ) and evaluate the potential impact on public health. The air monitoring data includes particulate matter and metals. The ADEQ’s primary objective of this

The purpose of this health consultation is to evaluate the air monitoring conducted by the Arizona Department of Environmental Quality at Mary McLeod Bethune School (Phoenix, AZ) and evaluate the potential impact on public health. The air monitoring data includes particulate matter and metals. The ADEQ’s primary objective of this air sampling is to provide an understanding of the hazardous air pollutants in the Phoenix area.

43309-Thumbnail Image.png
ContributorsHerrington, Don N. (Author) / Lin, Hsin-I (Author) / Botsford, Jennifer (Author) / Hasty, Brian W. (Author) / Humble, Will (Author) / Arizona. Office of Environmental Health (Author)
Created2006
Description

This report evaluates the potential exposure pathways associated with vermiculite concentrate processing activities at the Ari-Zonolite facility. The site is located in the near downtown area of Glendale, approximately ½ mile from the city hall, downtown shops, and other buildings. The former Ari-Zonolite facility received vermiculite from the Libby, Montana,

This report evaluates the potential exposure pathways associated with vermiculite concentrate processing activities at the Ari-Zonolite facility. The site is located in the near downtown area of Glendale, approximately ½ mile from the city hall, downtown shops, and other buildings. The former Ari-Zonolite facility received vermiculite from the Libby, Montana, mine. From 1951 to 1964, the site was leased the site to the Ari-Zonolite Company. Following the removal of the vermiculite concentrate processing equipment in 1964, several businesses have occupied the site. None of these businesses were involved in vermiculite processing activities. The last occupant of the former vermiculite processing building was an automotive restoration business, which vacated the site in 2002.

42324-Thumbnail Image.png
Created2008-07-01
Description

This study documents the as-built condition and provides hydraulic support for a Letter of Map Revision application for the Camino Real Wash.

43002-Thumbnail Image.png
Created2001-09-01
Description

Beginning with the 1988 Doney Park Area Plan as a foundation, the Area Plan Committee took an in-depth look at how needs had changed in the ten years since that original Plan was written. After countless hours of discussion and debate, a formal survey of every resident in the planning

Beginning with the 1988 Doney Park Area Plan as a foundation, the Area Plan Committee took an in-depth look at how needs had changed in the ten years since that original Plan was written. After countless hours of discussion and debate, a formal survey of every resident in the planning area, and many public open houses, the Committee created a draft version of this plan, which was submitted to the public for comment. The final version was approved by the County Planning and Zoning Commission in May 2001, and by the County Board of Supervisors in June of that year. While this Plan does not replace the County Comprehensive Plan or Zoning Ordinance, it does provide additional information for decision-makers when faced with issues of growth and development in the Doney Park Timberline-Fernwood areas. Most especially what this Plan does is to represent what residents want to see for their area of the County.