Filtering by
The objectives of this report are to document the on-site and off-site hydrologic and hydraulic assessment of the site and its characteristics, quantifying existing conditions peak discharges, and define the limits of 100-year on-site floodplains.
Phase IIA focuses on identifying alternatives for mitigating the hazards and problems, evaluating the alternatives for flood mitigation potential and cost effectiveness, and recommending a preferred alternative and flood control policy.
At a “micro” level, the study developed information and provided recommendations to assist each of the paratransit programs in the region to operate services in the most efficient and effective manner possible. At the “macro” level, the study considered alternative regional service designs and developed a regional service plan for the area that would improve mobility for people with disabilities and satisfy the requirements of the Americans with Disabilities Act.
The annual Transit Performance Report provides information to the Board of Directors and member cities concerning ridership, operating costs, fare revenue, and serves as input to Maricopa Association of Governments' Regional Transportation Plan updates.
With the agency integration of Valley Metro and Valley Metro Rail, the budgets for each agency are developed with a unified staffing plan but are maintained as two separate financial entities, with fund and project accounting to segregate revenues and expenses. Each Operating and Capital Budget has been prepared with the goal of delivering a fiscally prudent, balanced budget. FY 2006/2007 was the first full year of Proposition 400 Public Transportation Fund revenues; FY 2005/2006 reflected only five months of PTF revenues.
Study to determine overall performance of current bus service offerings through a detailed analysis of performance factors. Outcomes should include strategies to improve, eliminate or modify lowest performance-related services and development of recurring evaluation strategy and methodology that can be applied to a regular rating process.
Presents a plan that identifies management objectives, that articulates policies, and that lists specific actions that will be taken related to the management of Tucson Mountain Park. The Background Report (2007) provides a comprehensive summary of the existing conditions, resources, and features of the Park.
The Pima County Department of Transportation in cooperation with the Town of Oro Valley and the Regional Transportation Authority proposes to widen approximately 5 miles of La Cholla Boulevard from a two-lane arterial roadway into a four-lane divided arterial roadway between Magee Road and Tangerine Road. During Phase 1 of the proposed project, PCDOT will lead the preliminary roadway design for the entire corridor and will design and construct the roadway improvements from Magee Road to Lambert Lane. During Phase 2, the Town of Oro Valley will complete the design and construct the roadway improvements from Lambert Lane to Tangerine Road.
The purpose of this Pima County roadway project is to improve operations on Colossal Cave Road within the project limits while being sensitive to the surrounding environmental features and land uses. Potential impacts of the project are on the historic adobe building; the historic Shrine of the Santa Rita property during construction on biological resources, utilities, access, traffic operations, noise, and air quality.