Filtering by
- Creators: Von Tilzer, Albert
Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change as the regional transit network develops over the life of the 20 year transit program.
The Arizona Department of Transportation, through its Multimodal Planning and Communications divisions, collaborated with the town of Queen Creek to conduct a transportation study of the Germann Road corridor. The study, which is funded through the Planning Assistance for Rural Areas (PARA) program, was completed in July 2013.