Matching Items (16)
42438-Thumbnail Image.png
ContributorsParsons Brinckerhoff (Contributor)
Created2009-09
Description

Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change

Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change as the regional transit network develops over the life of the 20 year transit program.

115396-Thumbnail Image.png
Created2014-06
Description

Planning to Programming Link development started with ADOT's multimodal visioning called "Building a Quality Arizona" (bqAZ), the 2010 Statewide Transportation Planning Framework Study created a fiscally-unconstrained vision for the state's transportation system in 2050. bqAZ led to "What Moves You Arizona?," the state's Long-Range Transportation Plan 2010-2035, which applied financial

Planning to Programming Link development started with ADOT's multimodal visioning called "Building a Quality Arizona" (bqAZ), the 2010 Statewide Transportation Planning Framework Study created a fiscally-unconstrained vision for the state's transportation system in 2050. bqAZ led to "What Moves You Arizona?," the state's Long-Range Transportation Plan 2010-2035, which applied financial constraint to the vision, identifying anticipated revenues and providing a recommended investment choice (RIC) that indicates how revenues will be allocated to four different investment types: preservation, expansion, modernization, and non-highway. The third step, and subject of this report, is "Linking the Long-Range Plan and Capital Improvement Program," or P2P Link, which focuses on how ADOT and its primary business partners, the Federal Highway Administration (FHWA), Metropolitan Planning Organizations (MPOs), and Councils of Governments (COGs), fund, build, maintain and operate the transportation system.

42560-Thumbnail Image.png
Created2005-02-15
Description

Evaluates the conservation significance of county-owned properties in Avra Valley, specifically with regard to Priority Vulnerable Species and the Sonoran Desert Conservation Plan.

42365-Thumbnail Image.png
ContributorsRosen, Philip C. (Author) / Funicelli, Carianne (Author) / U.S. Fish and Wildlife Service (Publisher)
Created2008-01-31
Description

A diverse community of abundant, native amphibians is persisting along waterways of urban and urbanizing Tucson. Community and government leaders in Tucson support the concept of urban amphibian conservation in principle. Meanwhile, concurrent, commingled plans for infrastructure improvements and ecological restoration along major urban riparian corridors are being developed under

A diverse community of abundant, native amphibians is persisting along waterways of urban and urbanizing Tucson. Community and government leaders in Tucson support the concept of urban amphibian conservation in principle. Meanwhile, concurrent, commingled plans for infrastructure improvements and ecological restoration along major urban riparian corridors are being developed under leadership from Pima County, City of Tucson, and U.S. Army Corps of Engineers.

Paradoxically, as this work gets underway, it could impact local amphibian populations – temporarily via direct earth-moving impacts, and permanently via elimination of seasonal waters in which amphibians breed. Pima County wishes to minimize these negative impacts, and to learn how to protect, manage and improve habitat conditions for native amphibians. This report describes means by which—despite complex public health issues—such conservation may be possible with proper planning.

42371-Thumbnail Image.png
ContributorsParsons Brinckerhoff (Contributor)
Created2012-04
Description

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design

This floodplain study was prepared to identify the extent and magnitude of flooding within the boundary of the park under existing conditions. The results of the analysis and the associated hydrologic/hydraulic model will serve as the base condition model for all future developments to aid in the planning and design process.

41840-Thumbnail Image.png
Created2015
Description

Arizona Department of Administration's Strategic Plan for fiscal years 2016-2020, intended to realize efficiencies and improve service delivery to Arizona State government agencies and Arizona State employees.

113245-Thumbnail Image.png
ContributorsArizona. Department of Transportation (Issuing body) / Arizona. Multimodal Planning Division (Issuing body) / Parsons Brinckerhoff (Publisher) / Maguire Company (Publisher)
Created2014-03
Description

The Multimodal Planning Division (MPD) of the Arizona Department of Transportation has been tasked with identifying corridors throughout the state where improvements to the transportation infrastructure supports the greatest potential commercial and economic benefits. These "Key Commerce Corridors" represent a strategic statewide approach to leverage infrastructure improvements to enhance Arizona's

The Multimodal Planning Division (MPD) of the Arizona Department of Transportation has been tasked with identifying corridors throughout the state where improvements to the transportation infrastructure supports the greatest potential commercial and economic benefits. These "Key Commerce Corridors" represent a strategic statewide approach to leverage infrastructure improvements to enhance Arizona's competitive economic position. This document presents the basis for the identification and evaluation of the Key Commerce Corridors.

42719-Thumbnail Image.png
Created2001-10
Description

Because the West Branch area has been left alone, it has a chance to recover and become a part of the larger Paseo de las Iglesias project, and a cornerstone of a more extensive effort at ecological restoration involving the mesic coorridors of Pima County, the Santa Cruz, Rillito, and

Because the West Branch area has been left alone, it has a chance to recover and become a part of the larger Paseo de las Iglesias project, and a cornerstone of a more extensive effort at ecological restoration involving the mesic coorridors of Pima County, the Santa Cruz, Rillito, and Pantano.

42734-Thumbnail Image.png
Created2000-07
Description

This study by DR. Philip Rosen stands as one of the most impressive, given the scope of the author's knowledge, and it is one of the most ingenious, given the proposed concepts for restoration and protection of native fish and frogs within the urban Tucson Basin.