Filtering by
- All Subjects: Graham County (Ariz.)
- All Subjects: Mohave County (Ariz.)
- Creators: Battelle Memorial Institute. Technology Partnership Practice
The Board of Supervisors make an estimate of the different amounts required to meet the public expenditures/expenses for the ensuing year, also an estimate of revenues from sources other than direct taxation, and the amount to be raised by taxation upon real and personal property of Graham County.
This study focuses in the area surrounding the municipalities of: Town of Pima, City of Thatcher and City of Safford. The junction of the two major state routes, US 191 and US 70 is located in the heart of these communities and serves as major arterials for local travelers. Parsons Brinckerhoff has been commissioned by ADOT to perform this preliminary assessment for the development of an alternate route through the Thatcher/Safford/Pima area.
This study, and the resulting transportation plan, is funded through ADOT’s Planning Assistance for Rural Areas (PARA) program. ADOT and the Town of Colorado City have retained the consultant team of Wilbur Smith Associates to conduct the study under the oversight and direction of a Technical Advisory Committee (TAC) that includes members from the Town of Colorado City; adjacent Hildale City, Utah; Mohave County; the Arizona Department of Transportation Multimodal Planning Division; the ADOT Flagstaff District Engineer’s office; and other interested parties.
In 1992, Graham County conducted a transportation study for the Gila Valley Region. This study prepared a long-range transportation plan and a transportation improvement program. Many of the improvements have been completed. The purpose of this study is to update the 1992 transportation plan and to address the current issues within the area.
The Graham County, Safford, Thatcher, Pima Small Area Transportation Study was initiated by Graham County, in conjunction with the Arizona Department of Transportation, to develop a countywide, long-range multimodal transportation plan for this growing rural Arizona community. The project sponsors selected the PB Americas team to conduct this study under the direction of a Technical Advisory Committee, which included representatives from Graham County, City of Safford, Town of Thatcher, Town of Pima, Southeastern Arizona Governments Organization, and ADOT.
From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted water supplies in Arizona. The ADEQ investigated the total chromium and hexavalent chromium (chromium VI) concentrations in (1) public water supply wells, (2) combined industrial and domestic water supply wells, and (3) private domestic water supply wells at Topock and Golden Shores, Arizona. The communities of Topock and Golden Shores have expressed their concerns regarding the findings. Thus, the ADEQ requested the Arizona Department of Health Services to evaluate the potential health effects of exposure to well water contaminated with chromium.
Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.
It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.