Matching Items (12)
Filtering by

Clear all filters

42910-Thumbnail Image.png
Created2010-01-14
Description

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City

The City of Chandler developed the South Arizona Avenue Entry Corridor Study in 2006, setting forth a vision for the development of the corridor between Dr. A.J. Chandler Park and the new SanTan Freeway, ¾ mile to the south. Between downtown and the freeway is the corridor that the City intends to see redeveloped, with mixed residential and commercial uses to create a dynamic new “front door” for Chandler. The purpose of these design guidelines is to guide zoning requests within the South Arizona Avenue Corridor to achieve the objectives of the Chandler General Plan. The overall goal of these objectives is to implement the vision for South Arizona Avenue. The guidelines address the major design aspects of new office, retail and residential buildings in the corridor. Design Guidelines are not building or streetscape designs; they provide design direction so that each project’s architectural design will reinforce the City’s strategic intentions as this important area of the city responds to its new role as Chandler’s “front door.” These guidelines also identify streetscape design principles for South Arizona Avenue with the objective of coordinating public and private design in the Corridor.

42391-Thumbnail Image.png
Created2007-04-30
Description

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for

Grace Neal Parkway and Bank Street are located in the northern Kingman area partially outside of the Kingman city limits. This report discusses of creating a new arterial roadway providing safety and convenience for vehicular traffic and pedestrians. Although Grace Neal is referred to as a parkway, its designation for design is arterial.

42410-Thumbnail Image.png
Created2009-06
Description

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the

It was decided to revise the 1980 Havasu area study, since the area had changed so much. The members felt that to retain some control over the growth a revised area plan was needed and decided to have the area covered to be just the 72 square miles of the Desert Hills Fire District, rather than the whole of the unincorporated Lake Havasu Area north of the City.

42441-Thumbnail Image.png
Created2011-03
Description

Scottsdale Road and Rural Road are identified in the Regional Transportation Plan as an arterial Bus Rapid Transit route. The portion of this route within Scottsdale is programmed and funded in the Transit Life Cycle Program.

Created1996 to 2007
Description

This report was commissioned by the City of Scottsdale and conducted by Behavior Research Center. The purpose of the study was to measure attitudes about the use of photo-based traffic enforcement statewide.

42917-Thumbnail Image.png
Created1998-11-05
Description

The Chandler Airpark area encompasses nine square miles surrounding the Chandler Municipal Airport. The area plan provides the City of Chandler with a document that will strategically guide future development in and around the existing airport. The two major goals of this plan are the protection of the Municipal Airport

The Chandler Airpark area encompasses nine square miles surrounding the Chandler Municipal Airport. The area plan provides the City of Chandler with a document that will strategically guide future development in and around the existing airport. The two major goals of this plan are the protection of the Municipal Airport from residential encroachment and the aggressive economic development of the Airpark area.

Created2003-04
Description

A statement of the City of Scottsdale's plan for a functional network of 286 miles of non-motorized, unpaved, multi-use trails to respond to public needs.

41876-Thumbnail Image.png
Created2014-08
Description

A study of a sample of individuals who contacted the Scottsdale Convention and Visitors Bureau from April 2013 to March 2014, to determine their travel patterns (length of stay, activities during stay, trip spending, etc.) and demographics.

42014-Thumbnail Image.png
Created2015-05
Description

In fiscal year 2012, Scottsdale Unified School District’s student achievement was similar to peer districts’, on average, but it compared less favorably in operational efficiencies. The District’s food service program operated efficiently with a cost per meal that was lower than the peer district average. However, the District’s administrative costs

In fiscal year 2012, Scottsdale Unified School District’s student achievement was similar to peer districts’, on average, but it compared less favorably in operational efficiencies. The District’s food service program operated efficiently with a cost per meal that was lower than the peer district average. However, the District’s administrative costs were higher than peer districts’, primarily because it employed more administrative staff. In addition, the District inaccurately reported its costs on its Annual Financial Report and it lacked sufficient computer controls. The District’s plant operations cost per pupil was higher than peer districts’, on average, because the District maintained more square footage per student than the peer districts’ and many of its schools operated far below their designed capacities. Further, the District’s transportation cost per mile was much higher than the peer districts’ average, in part, because of inefficient bus routes.

43267-Thumbnail Image.png
Created2005-09-07
Description

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted

From May 2005 to June 2005, the Arizona Department of Environmental Quality conducted a study, Potable Well Sampling Task 4.0, to determine if the chromium and chromium VI plume due to the discharge of the Pacific Gas and Electronic Topock Compressor Station has migrated under the Colorado River and impacted water supplies in Arizona. The ADEQ investigated the total chromium and hexavalent chromium (chromium VI) concentrations in (1) public water supply wells, (2) combined industrial and domestic water supply wells, and (3) private domestic water supply wells at Topock and Golden Shores, Arizona. The communities of Topock and Golden Shores have expressed their concerns regarding the findings. Thus, the ADEQ requested the Arizona Department of Health Services to evaluate the potential health effects of exposure to well water contaminated with chromium.